Similar Projects
Jeff Valley South Stewardship IRSC
Term Contract
Design
Palomar Mountain, CA 92060

CHP South Lake Tahoe Area Office - Snow and Ice Removal Services
Term Contract
Bidding
South Lake Tahoe, CA 96150

Unsheltered Resident Encampment Site Waste Removal and Cleanup
Infrastructure
Bidding

S205--Solid Waste Disposal Service
Term Contract
Post-Bid
Fresno, CA

The Haskell Stewardship Integrated Resource Timber Contract (IRTC)
Infrastructure
Post-Bid
Quincy, CA

District-Wide Portable Restroom Facilities and Services
Term Contract, Alteration
Results
Bakersfield, CA 93314

Site Demolition
Infrastructure, Alteration
Results
Cudahy, CA 90201

Debris Removal Services
Infrastructure
Bidding
Anaheim, CA

Trash Collection, Hauling, and Disposal Services
Term Contract, Infrastructure
Post-Bid
Kyburz, CA

Illegal Roadside Waste Pickup
Infrastructure
Bidding
$1,500,000 est. value
Clovis, CA

Trash Collection, Hauling and Disposal Services in Mendocino County
Infrastructure
Post-Bid
Ukiah, CA

Non-Hazardous Waste Removal and Recycling Services
Infrastructure
Bidding
Carmichael, CA 95608

S205--Bridge - Solid Waste Collection Disposal
Term Contract
Post-Bid
Rancho Cordova, Sacramento, CA 95655

Road Materials and Hauling Services
Infrastructure
Bidding
Fairfield, CA

Unsheltered Resident Encampment Site Waste Removal and Cleanup
Term Contract, Infrastructure
Post-Bid

Reported 11/03/2021 12:00 AM
Project Title

Hutchinson Road Tree Removal Project

Physical Address View project details and contacts
City, State (County) Sebastopol, CA 95472   (Sonoma County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $150,000
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Remove stand of Eucalyptus trees on Hutchinson Road starting at Hessel Road and ending at address 5150 Hutchinson Road. Trees must be removed by February 11, 2022 due to nesting bird season. Once trees are removed all stumps will be ground per the requirements below. Contractor will be responsible for providing all necessary traffic control, note Hutchinson Road has no possible detour and cannot be closed for the duration of work – short closures for safety reasons may be possible. Remove all Eucalyptus trees adjacent to the roadway. A Eucalyptus tree at either end of the stand is marked with an orange dot at the base. All wood, brush, and chips from this project shall be removed. The stumps shall be cut within 8-inches of soil grade and ground 2-feet below existing soil grade. All debris from the Eucalyptus trees on the ground prior to work 1/2-inch diameter and larger shall be removed. The stumps shall be cut within 8 inches of soil grade and ground 2-feet below existing soil grade. All stump grinding material shall be left in the hole/depression and the excess creating a mound shall be spread over the surrounding soil. Spread ground material from the stump grinding operation shall not exceed a depth of 6-inches.

Details

Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents