Similar Projects
Curb Stops, Corporations and Other Brass Goods
Post-Bid
Sewickley, PA 15143

Furnish Type K Copper Pipe
Post-Bid
New Stanton, PA 15672

Forcemain Improvement Project
Results
PA

Pipe Replacement and New Pipe Installation
Results
Less than $31,000 est. value
Homer City, PA 16915

Bartram's Mile Maintenance Building and Water Service Extension
Renovation
Construction
$43,000,000 est. value
Philadelphia, PA 19143

Drive Access Road
Renovation
Construction
Danville, PA 17821

Resilient Seated Gate Valves
Post-Bid
Sewickley, PA 15143

2019 Small Diameter Water Main Replacement Contract
Results
Pittsburgh, PA

Polyvinyl Chloride Water Pipe PVC
Post-Bid
Sewickley, PA 15143

2020 Water Main Renewal Project
Results
$1,250,000 to $1,500,000 est. value
Chester, PA 19016

Waste Water Treatment Facility ORF Influent Meter Project 2020
Post-Bid
Erie, PA 16507

University Drive Road / Curb And Waterline Loop Repairs Sitework
Results
$900,000 est. value
Hazleton, PA 18202

Valve .5" Sweat-End Ball,(Nibco SPF-600A
Post-Bid
Less than $25,000 est. value
Philadelphia, PA

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Furnish PVC Pipe
Term Contract
Post-Bid
New Stanton, PA 15672

Last Updated 11/26/2021 02:20 PM
Project Title

Willows Park Water Main Replacement

Physical Address View project details and contacts
City, State (County) Wayne, PA   (Chester County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

For the Willows Park Water Main Replacement including construction of new 6-inch diameter Class 52 ductile iron fire service line in combined trench with a new 2-inch diameter HPDE pipe domestic potable water service line, construction of two (2) Fire Hydrants, construction of new Service Connections to the existing Cottage and Mansion, construction of a dual service meter pit in accordance with Aqua standards and connect to the new services installed by Aqua at the Darby Paoli Road right-of-way, directionally drill approximately 157 LF of 6-inch and 2-inch fire and domestic service, and complete all required pavement and vegetative restoration.

Details

Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents