Similar Projects
SH 103 Culvert Replacement
Post-Bid
Idaho Springs, CO 80452

High Point Neighborhood Park West
Post-Bid
Denver, CO

2019 Bayfield Culvert Repair
Results
$200,000 to $300,000 est. value
Bayfield, CO 81122

Embankment Material
Results
CO

Detention Ponds Improvement Project
Post-Bid
Golden, CO

Installs Soldier Piles and Reinforced Facing Along A Cantilevered Concrete Retaining Wall That Was Undermined From North Clearcreek Scour
Results
Less than $1,000,000 est. value
CO

District Infrastructure To Service Solstice Filings 2-4
Post-Bid
Centennial, CO

Culvert Relining (Spray-Applied)
Results
Less than $1,000,000 est. value
CO

Constructing Two Extended Detention Basins, Trenching, and Drainage Pipe
Post-Bid
$5,000,000 to $20,000,000 est. value
CO

Suckla #1 Reclamation
Results
Less than $25,000 est. value
Naturita, CO 81422

Sterling Ranch Middle Fork Street
New Construction
Post-Bid
Highlands Ranch, CO

Pipe Supply for City Streets Division
Results
Grand Junction, CO 81501

Detention Pond Improvements
Post-Bid
Golden, CO

Pmaa, Wray SFU - Pond Liners
Results
Less than $361,669 est. value
Wray, CO 80758

2020 Culvert Pipe Maintenance Services
Term Contract
Post-Bid
Brighton, CO 80601

Last Updated 12/09/2020 11:13 AM
Project Title

Z--BLM CO NWD KFO Junction Butte Dsgn-Bld

Physical Address View project details and contacts
City, State (County) Kremmling, CO 80459   (Grand County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $25,000 to $100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Junction Butte Pump Improvement Design-Build Contract consists of improvements to the Colorado River channel and bank area in order to improve pump performance at BLM Colorado’s Junction Butte Watchable Wildlife Area (see the following vicinity map). This project primarily consists of the following features as well as others listed in the following specifications, guides, and attached drawings: 1. Survey verification of existing survey and or supplemental survey as necessary 2. Elevation design and construction verification 3. In-channel river excavation 4. In-channel river-bank extension 5. Bank and rip-rap toe protection 6. In-channel rock vane construction 7. Channel cross-vane structure 8. Dewatering and personnel safety plan for construction 9. Line existing ditch at south bank. 10. Construction site disturbed area seeding 11. Revegetate disturbed banks with on-site willows (at the option of the Government) 12. Pump inlet area sediment removal

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents