Similar Projects
Striping Trucks - Electronic Pavement Marking Systems Maintenance and Repair/Statewide
Post-Bid

Asphalt Crack-Sealing
Post-Bid
Lewiston, ME 04240

2019 North River Road Reconstruction Project
Results
Auburn, ME

2019 Fifth Street Reconstruction Project
Results
Less than $510,000 est. value
Auburn, ME

Supply all Needed Materials and Labor to Install and Hook Up Water Main Pipe on the CMCC Campus
Post-Bid
Auburn, ME 04210

2019 Fire Station Driveways Reconstruction Project
Results
Auburn, ME 04210

Repair and Pave Roadways, Parking Lots and Sidewalks on the CMCC Campus
Post-Bid
Auburn, ME

(LCP) Light Capital Paving
Results
Less than $1,200,000 est. value

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Post-Bid

(LCP) Light Capital Paving and Profile Milling
Results
$2,700,000 est. value

2020 Reconstruction Project
Post-Bid
Less than $1,250,000 est. value
Auburn, ME 04210

(LCP) Light Capital Paving
Results
Less than $3,400,000 est. value
Andover, Bethel, Buckfield, Gilead, Greenwood, Hebron, Mexico, Minot, Norway, Paris, Peru, Roxbury, Rumford, Stow, Sumner, West Paris, ME

2019 Chestnut Street Construction Project
Results
Auburn, ME

Boston-Noble-Moody Water/Road Rehabilitation
Results
Lewiston, ME

Sabattus Street Water Main Replacement Phase 4
Results
Less than $750,000 est. value
Lewiston, ME

Last Updated 03/22/2019 09:27 AM
Project Title

2019 Water Main and Road Rehabilitation - Various Streets

Physical Address View project details and contacts
City, State (County) Lewiston, ME   (Androscoggin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description 1. Replacement of the existing 6" water main and services on all roadways within the project area; the water main shall be replaced with the following: a. 530 linear feet of 8" diameter water main on Campus Avenue, between Sabattus Street and East Avenue. b. 550 linear feet of 6" diameter water main on Newman Street, between Campus Avenue and East Avenue. c. 775 linear feet of 8" diameter water main on Fairlawn Avenue, between East Avenue and Shirley Street. d. 850 linear feet of 6" diameter water main on Morris Avenue, between Brault Street and Dingley Street. e. 790 linear feet of 6" diameter water main on Stanley Street, between Sabattus Street and Montello Street. 2. Reconstruction of the following roadways: a. 650 linear feet of Campus Avenue (Sabattus to East). b. 700 linear feet of Newman Street (Campus to East). c. 780 linear feet of Fairlawn Avenue (East to Shirley). d. 650 linear feet of Stanley Street (Sabattus to Montello). 3. Reconstruction of bituminous sidewalk for the following areas: a. 360 linear feet on the southern side of Campus Avenue. b. 580 linear feet on the southern side of Fairlawn Avenue. 4. Installation of approximately 560 linear feet of storm drain and under drain on Stanley Street. 5. Replacement of approximately 20 manhole frames and covers and catch basin frames and grates.
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Sidewalks, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents