Similar Projects
Summer Street Units
New Construction
Conception
Walpole, MA 02071

Residences At Colony Place
New Construction - 20,962 SF
Conception
Less than $5,500,000 est. value
Quincy, MA 02170

Buddhist Temple
New Construction
Design
$4,000,000 est. value
Quincy, MA 02169

Day Street Units
New Construction
Design
Norwood, MA

Unit Turnover: Full Interior Renovation
Renovation
Results
$89,950 est. value
Foxborough, MA 02035

The Bristol
New Construction - 57,945 SF
Construction
$1,750,000 est. value
Wellesley, MA

Vernon Street Units
New Construction, Demolition - 5,503 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Brookline, MA

Myrtle Street Units
New Construction, Demolition
Pending Verification
Quincy, MA

Clark Tavern Residential
New Construction
Pending Verification
Medfield, MA

Bungay Brook Townhouse Development
New Construction
Conception
Bellingham, MA 02019

Residences at 209 Harvard Street
New Construction, Renovation
Design
Brookline, MA

Winthrop Road Units
Renovation, Addition - 8,157 SF
Construction
Brookline, MA

Moosehill Road Units
New Construction
Pending Verification
Walpole, MA 02032

Bennett Lane Redevelopment
New Construction
Conception
Quincy, MA 02169

Hancock Street Units
New Construction - 50,857 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Braintree, MA 02184

Reported 03/31/2022 01:07 AM
Project Title

Conversion of Existing Building

Physical Address View project details and contacts
City, State (County) Boston, MA   (Norfolk County)
Category(s) Residential
Sub-Category(s) Multi-Family Homes
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Conversion of existing building is an 8-story steel/concrete framed structure with concrete and masonry exteriors consisting of 132 residential units and community spaces for the elderly/ disabled population. The building will be occupied during construction. New work includes miscellaneous site revisions, exterior repairs and replacements, renovations to common areas and individual units and upgrades to fire protection, HVAC and MEP systems.

Details

Multi-Family Homes, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents