Last Updated | 08/01/2022 05:03 PM |
Project Title | Water System Extensions Project (Phase VIII) - Contracts 1, 2 and 3 |
Physical Address | View project details and contacts |
City, State (County) | French Creek, WV 26201 (Upshur County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Site Development, Storage/Water Tanks, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $3,000,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | For the construction of approximately 165,480 LF of 10, new and replacement waterlines, new 53,000 gallon and 64,000 gallon water storage tanks, new 25 gpm, 50 gpm and 70 gpm booster pump stations, three (3) booster pump station upgrades, three (3) pressure reducing stations, and telemetry and controls to serve approximately 136 new customers in Upshur and Randolph Counties, WV A summary of the work to be bid upon is described as follows: CONTRACT 1: Construction of approximately 102,257 LF of 10 , new and replacement waterlines, 52 meter settings, three (3) booster pump station upgrades, two (2) pressure reducing stations, steel casing, water valves, fire hydrants and other related appurtenances necessary to construct a complete and functional water distribution system. CONTRACT 2: Construction of approximately 63,223 84 meter settings, the installation of 25 gpm, 50 gpm and 70 gpm booster pump stations, one (1) pressure reducing station, steel casing, water valves, fire hydrants and other related appurtenances necessary to construct a complete and functional water distribution system. CONTRACT 3: Construction of 53,000 gallon and 64,000 gallon water storage tanks; site preparation, access roads, tank foundations, fencing and gate, telemetry and controls, and other related appurtenances necessary to construct a complete and functional water storage system. Bidders must comply with the requirements for Affirmative Action and Minority Business Enterprises participation as described in the Federal Specifications insert to the Contract Documents. Bidders must comply with Title VI of the Civil Rights Act of 1964, the Davis-Bacon Act, the Copeland Act, the Contract Work Hours and Safety Act, and the West Virginia Division of Labor Wages for Construction of Public Improvements pursuant to West Virginia Code 21-5A-3. According to current West Virginia law, state prevailing wage rates do not apply to this project. Contractors shall abide by all local, state, and federal minimum wage laws. Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A - Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent statutes mandating domestic preference applies an American Iron and Steel requirement to this project. All listed iron and steel products used in this the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and construction materials. The deminimis and minor components waiver apply to this contract. No Bid may be withdrawn for a period of ninety (90) days after the time of the opening of the Bids. Any Contractor submitting a Bid on this project hereby certifies, indicates, and acknowledges that he/she has a license and meets all the qualifications required by the statutes of the state and subdivision in which the work is to be performed. To guarantee the faithful performance of the Contract, the successful Bidder will be required to furnish the Owner a Performance Bond and Payment Bond for 100% of the Contract price. These Bonds are the ones that are executed in connection with a Contract to secure fulfillment of all the Contractor's obligations under such Contract. Bids received after the scheduled closing time will be returned unopened to the bidders. The Adrian Public Service District reserves the right to reject any or all Bids. |
||||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |