Similar Projects
On-Call Task Order General Construction Services FY 19/20
Term Contract
Post-Bid
Salt Lake City, UT

Water Line at Vernal Memorial Park
Post-Bid
Vernal, UT 84078

Z--Dino - Design/Build, Replace Water Line
Results
$500,000 to $1,000,000 est. value
Jensen, UT 84035

Cedar City Air Tanker Base Water Pipe Repair
Results
Less than $25,000 est. value
Cedar City, UT

Culinary Water Improvements
Post-Bid
Less than $700,000 est. value
Levan, UT 84639

Construction of the 2019 Fire Flow Projects
Results
UT

18” Well Transmission Pipeline Project - Materials Supply
Post-Bid
Hurricane, UT 84737

18K: Printers Row Waterline Replacement
Results
West Valley City, UT

Pre-Qualified Contractors for Construction Projects
Post-Bid
South Jordan, UT

2019 State Street Waterline Replacement
Results
Less than $1,200,000 est. value
Murray, UT 84107

Continental Drive Reconstruction Project
Post-Bid
Less than $690,000 est. value
Farmington, UT 84025

Decommissioning Water Systems
Results
$50,000 to $100,000 est. value
Price, UT 84501

400 East 540 North to Center Street Culinary Waterline
Post-Bid
$250,000 est. value
Centerville, UT

Spanish Fork Ne Irrigation Pipeline
Results
Spanish Fork, UT

19D: Large Meter Replacement Project
Post-Bid
West Valley City, UT

Reported 04/21/2020 03:44 PM
Project Title

Bryner Ploutz Pipeline

Physical Address View project details and contacts
City, State (County) Helper, UT 55101   (Carbon County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status All Bids Rejected
Bids Due View project details and contacts
Estimated Value $50,000 to $100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project materially consists of: Tapping into an existing 36" HDPE irrigation pipeline to add a 10" HPDE junction; placing ~770' LF of 10" HDPE pipeline, including one road crossing with multiple utilities; connecting new 10" HDPE pipeline to existing 10" HDPE pipeline; installing all pipeline appurtenances; and constructing a pumping plant with VFD. All work is to be completed summer/early fall 2019 during the irrigation season. Water in the 36" pipeline will be shut off for the minimum duration possible and work should be planned for an expeditious connection to the supply pipeline. Work period is estimated to be 14-28 days. Completion is required prior to Sep 30, 2019.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents