Similar Projects
Stockyards Industrial Development
New Construction, Infrastructure
Design
West Fargo, ND 58078

Visto Industrial Additions Pavement
Infrastructure
Bidding
$300,000 est. value
Horace, ND

Visto Industrial Additions Pavement
Infrastructure
Bidding
$300,000 est. value
Horace, ND

Bolley Drive Reconstruction
Post-Bid
$342,260 to $344,066 est. value
Fargo, ND 58102

New Paving and Utility Construction Improvement
Post-Bid
$1,341,041 est. value
Fargo, ND

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Water Main Replacement, Street Reconstruction and Incidentals
Results
Less than $3,523,290 est. value
Fargo, ND 58102

2021 Cass County RCB (Suppliers)
Post-Bid
ND

Water Main Replacement, Storm Sewer, Street Reconstruction and Incidentals
Results
$3,523,290 est. value
Fargo, ND 58102

2021 FM Diversion Pipeline Improvements Phase 1
Infrastructure
Post-Bid
Kindred, ND

P.C. Concrete Alley Paving, Water Main and Incidentals
Results
Less than $163,673 est. value
Fargo, ND 58102

Grading, Salvaged Base, PCC Pavement, Storm Sewer, Watermain, Traffic Signal, Lighting, Shared Use Path
Infrastructure
Post-Bid
$16,000,000 to $17,500,000 est. value
Fargo, ND 58125

Grading, Base, Surfacing, and Incidentals
Results
ND

Water Main Repair Materials/Fire Hydrant/Street Materials
Alteration
Post-Bid
Fargo, ND

2021 Pavement Improvement
Results
$900,000 est. value
West Fargo, ND

Last Updated 06/21/2022 03:35 AM
Project Title

Maple Lake Estates Addition - Phase II

Physical Address View project details and contacts
City, State (County) Horace, ND   (Cass County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,710,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project shall include the construction of the Maple Lake Estates Addition - Phase II development; consisting of earthwork, sanitary sewer main, sanitary sewer services, water main, water services, storm sewer, subgrade preparation, geotextile fabric, aggregate base course, edge drain, concrete curb and gutter, asphalt pavement, sidewalks, signage, lighting, seeding, hydromulch, and other miscellaneous items. The Project will consist of the following approximate quantities: 119,000 CY Borrow Material 5 Acres Seeding and Hydro Mulch 4,300 TON Aggregate Base Course Class 5 3,000 TON FAA 43 Asphalt Pavement 10,600 CY Subgrade Preparation 17,200 CY Topsoil 2,800 LF Concrete Storm Sewer Various Sizes 1,200 LF 8" PVC Sanitary Sewer 3,700 LF 6" PVC C900 Watermain 5,700 LF Concrete Curb and Gutter 800 SY Sidewalk Concrete 60 Utility Services (Water, Sanitary, Sump Pump) 1 Gate Traffic Control and all miscellaneous work necessary therefor and incidental thereto.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents