Similar Projects
Shaver Road Bridge and Floodwall, Phase 3
Conception
$2,500,000 est. value
Cedar Rapids, IA

Edgewood Road Trail Phase 2B - Bridge Modifications and Trail
Conception
$4,060,000 est. value
Cedar Rapids, IA 52407

Dickinson County Templar Park - Highway 9 Access - Hinshaw Bridge Access Courtesy Docks
New Construction, Infrastructure
Bidding
$180,000 est. value
IA

Bridge Replacement - CCS
New Construction
Bidding
IA

3rd Street South East Bridge Removal
New Construction
Post-Bid
Less than $181,000 est. value
Waverly, IA 50677

Camp Dodge Training Area Bridge Replacement
Renovation
Post-Bid
Johnston, IA

West Des Moines Digital Enterprise Segment 5-3 Raccoon River Crossing
New Construction
Results
West Des Moines, IA

J Street SW Bridge Over Prairie Creek Repairs
New Construction
Results
$25,000 est. value
Cedar Rapids, IA 52404

Shaver Road Bridge and Floodwall, Phase 4
Conception
$1,500,000 est. value
Cedar Rapids, IA 52402

Bridge Deck Overlay
New Construction
Bidding
IA

Bridge Replacement with Twin RCB - BR 1270
New Construction
Results
Less than $375,000 est. value
Polk City, IA

Bridge Deck Overlay
New Construction
Bidding
IA

2021 Bridge Repair
Renovation, Infrastructure
Results
Webster City, IA 50595

Bridge Replacement - CSS
New Construction
Bidding
IA

Booneville Road Bridge Over Johnson Creek
New Construction
Results
$1,461,000 est. value
West Des Moines, IA 50266

Last Updated 10/20/2021 03:00 AM
Project Title

Bridge and Approaches - PPCB

Physical Address View project details and contacts
City, State (County) IA   (Harrison County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Route : F50 On f 50, Over Allen Creek, s35 t79 r44 5.00 Each Beams, Pretens. Prestr. Conc. 832.00 Linear Foot Culvert Pipe 9,591.00 Cubic Yard Embankment-In-Place 540.30 Square Yard Engineering Fabric 8,274.00 Cubic Yard Excavation Class 10 125.00 Cubic Yard Excavation Class 20 4.40 Acre Mulching .30 Acre Native Grass Seeding 3.59 Station Pavement Markings 3,189.20 Square Yard Pavement, p.c.c. 1,700.00 Linear Foot Pile, Steel h, 10 In. 40,669.00 Pound Reinforcing Steel, Epoxy Coated 3,258.50 Square Yard Removal Of Pvmnt/Drives/Sdwk 473.50 Ton Revetment 4.10 Acre Seeding & Fertilizing 172.40 Cubic Yard Structural Concrete 1,212.00 Pound Structural Steel 3,303.00 Cubic Yard Topsoil, Strip/Salvage/Spread 0001 Items for a 90'-0 x 30'-0 Precast Prestressed Concrete Beam Bridge

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents