Similar Projects
Roadway Project on East Main Street
Infrastructure
Design
$400,000 CJ est. value
Leadington, MO 63601

Roadway Project on East Main Street
Infrastructure
Design
$400,000 CJ est. value
Leadington, MO 63601

MODOT Statewide Annual Plant (Cold) Mix Oil Material - Premix
Infrastructure
Post-Bid

Workforce Innovation and Education Center - Site Development Package
Infrastructure
Post-Bid
Park Hills, MO 63601

Intersection Improvement
Infrastructure
Results
$75,000 to $100,000 est. value
MO

Job Order Contract for Concrete Pavement Repair
Infrastructure
Results
$250,000 to $500,000 est. value

Mineral Area Apartments
New Construction, Infrastructure
Pending Verification
$15,842,400 CJ est. value
Farmington, MO 63640

2022 Asphalt Street Improvements
Infrastructure
Post-Bid
Farmington, MO

Asphalt Pavement Repairs at Various Locations on I-55, I-57, and I-155 in the SE District
Infrastructure
Results
$100,000 to $250,000 est. value

2022 Excavation and Hauling
Infrastructure
Post-Bid
Farmington, MO

Intersection Improvement at Various Locations in the SE District
Infrastructure
Results
$1,000,000 to $2,500,000 est. value

2022 New and Removal and Replacement of Concrete Curb and Gutter and Sidewalk
Infrastructure
Post-Bid
Farmington, MO

2022 Road Overlay Projects
Term Contract
Results
$1,400,000 est. value
Farmington, MO

Job Order Contract for Asphalt Pavement Repair
Infrastructure
Post-Bid
$100,000 to $250,000 est. value

Upgrade Latrines, Showers, and Exterior Paving
Infrastructure, Alteration
Results
$200,000 est. value
Farmington, MO 63640

Last Updated 05/25/2023 10:55 AM
Project Title

Wolf Creek Fire Protection District Parking Lot Expansion

Physical Address View project details and contacts
City, State (County) Farmington, MO 63640   (Saint Francois County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of removing the existing gravel parking lot (phase 2) and replacing with base rock and a concrete parking lot. The concrete parking lot is approximately 498 square yards and includes an ADA parking stall, parking bumpers and parking lot striping. The existing storm sewers will be extended to the roadway ditch. Roadway ditch will be regraded and rip rap will be placed at the outfall of the storm pipes. Construction method and materials shall conform to the design drawings and the Missouri Standard Specifications for Highway Construction, 2022 Edition. Question Deadline 04/17/2023 Every request forsuch interpretation should be in writing addressed to Mr.Joe Gabel, P.E., Taylor Engineering, 109 East Columbia, Farmington, MO 63640 (or by email at jgabel@taylorengineeringllc.com and to be given consideration must be received at least three (3) working days prior to the date fixed for the opening of bids.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents