Project Title | Wolf Creek Fire Protection District Parking Lot Expansion |
Physical Address | View project details and contacts |
City, State (County) | Farmington, MO 63640 (Saint Francois County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $300,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project consists of removing the existing gravel parking lot (phase 2) and replacing with base rock and a concrete parking lot. The concrete parking lot is approximately 498 square yards and includes an ADA parking stall, parking bumpers and parking lot striping. The existing storm sewers will be extended to the roadway ditch. Roadway ditch will be regraded and rip rap will be placed at the outfall of the storm pipes. Construction method and materials shall conform to the design drawings and the Missouri Standard Specifications for Highway Construction, 2022 Edition. Question Deadline 04/17/2023 Every request forsuch interpretation should be in writing addressed to Mr.Joe Gabel, P.E., Taylor Engineering, 109 East Columbia, Farmington, MO 63640 (or by email at jgabel@taylorengineeringllc.com and to be given consideration must be received at least three (3) working days prior to the date fixed for the opening of bids. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |