Similar Projects
FY20 Northrop Safe and Welcoming Entrance at Ericsson
Renovation, Alteration
Bidding
Minneapolis, MN 55406

Northrop Safe and Welcoming Entrance at Ericsson
Renovation, Alteration
Bidding
Minneapolis, MN

Fair Oaks Elementary School Alterations/Mechanical Upgrades
Renovation
Post-Bid
Minneapolis, MN 55429

Gleason Lake Elementary School Media Center Improvements and LTFM
Post-Bid
Plymouth, MN 55447

2021 Window Replacement at Vicksburg Crossing
Results
$650,000 to $700,000 est. value
Plymouth, MN 55447

Waite Park Elementary Kitchen Auditorium And Electrical Improvements
Renovation
Results
Minneapolis, MN 55411

Media Center - Group 1
Renovation
Bidding
Coon Rapids, MN 55433

Birchview Elementary School
Renovation
Post-Bid
Plymouth, MN 55447

North Park Elementary School - Window Replacement
Results
$400,000 est. value
MN 55432

Central Building District Office
Renovation
Bidding
Minneapolis, MN 55416

Well-Being Projects in Minneapolis Charter Schools
Renovation
Post-Bid
$3,500 est. value
Minneapolis, MN

Plymouth Creek Elementary Media Center Improvements
Results
Minneapolis, MN 55446

Heywood Interior Garage Door and Fuel Piping Added Bracing
Alteration
Bidding
Minneapolis, MN 55405

City View Elementary - Full Service Community School Renovation
Renovation
Post-Bid
Minneapolis, MN 55412

Lower Campus Community Education Office Remodel
Renovation
Results
Eden Prairie, MN 55344

Last Updated 03/10/2022 11:57 AM
Project Title

Nellie Stone Johnson Elementary School - Safe and Welcoming Entry

Physical Address View project details and contacts
City, State (County) Minneapolis, MN 55411 (Anoka, Hennepin Counties)
Category(s) Education, Single Trades
Sub-Category(s) Elementary School, Windows/Doors
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is to modify an existing school entrance into a safe and welcoming entry per MPS guidelines. Work includes some demolition, door and hardware modifications, and finish updates. Additionally, a school monument sign is an add alternate for the project.

Details

Elementary School, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents