Similar Projects
Wastewater Treatment Facility Expansion
Addition
Design
$12,000,000 to $12,300,000 est. value
Owatonna, MN 55060

Empire WWTP Solids Improvements Phase II
New Construction
Post-Bid
Farmington, MN 55024

Onsite Sanitary Treatment System Scenic State Park
Renovation
Post-Bid
$2,325,112 est. value
Bigfork, MN 56628

MCES Rogers Modifications
Renovation
Results
Rogers, MN 55374

Wastewater Treatment Facility
Results
Chisago City, MN 55013

Pre-CHP - Mist Elimination Improvements
Renovation
Post-Bid
Duluth, MN

Wastewater Treatment Facility Improvements
Results
$1,800,000 to $2,000,000 est. value
Madelia, MN

WLSSD Wastewater Treatment Facility
New Construction
Post-Bid
Duluth, MN

2021 Wastewater Treatment Facility Improvements
Addition
Results
$10,000,000 est. value
Melrose, MN

Wastewater Treatment Facility
Addition
Post-Bid
Caledonia, MN

2021 Odor Control Media Procurement
Results
Saint Paul, MN

Wastewater Treatment Facility Improvements
Renovation
Post-Bid
Lakefield, MN

Wastewater Treatment Facility Improvements
Results
Houston, MN 55943

Clarifier Improvements
Renovation
Post-Bid
Crosslake, MN

MWWTP Services Buildings and Site Improvements - Step 1
New Construction
Results
$35,000,000 est. value
MN

Last Updated 09/16/2021 02:39 PM
Project Title

Wastewater Treatment Plant Improvements

Physical Address View project details and contacts
City, State (County) Sherburn, MN   (Martin County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $6,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Collection system interceptor, manhole lining, and sanitary sewer replacement as shown. 2. Site work/landscaping. 3. Site piping/valves. 4. Replace trickling filter pumps and piping. 5. Replace primary clarifier scrapers and scum beach. 6. Trickling filter media replacement, rebuild distribution arm, rebuild exterior control boxes, rebuild rotary distributor. 7. New concrete aeration basin and fine bubble diffusers. 8. New positive displacement aeration blowers, including new blower room and garage extension. 9. Replace final clarifiers’ scrapers and scum beach. 10. RAS, WAS, and sludge transfer pump replacement. 11. New UV disinfection system, including building. 12. New concrete sludge storage tank, including new mixing system. 13. Electrical / controls.

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents