Similar Projects
Last Updated | 12/23/2019 03:49 PM |
Project Title | Hammond Creek Middle School Sewer Expansion Project |
Physical Address | View project details and contacts |
City, State (County) | Dalton, GA 30721 (Whitfield County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Sanitary Sewers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project will include the construction of a wastewater lift station, gravity sanitary sewer main, and a sanitary sewer force main. The lift station to be constructed for this project will be located across from the new Hammond Creek Middle School on Pleasant Grove Drive as shown on the plans. This includes but not limited to installing a 6-inch HDPE force main, approximately 1,420 linear feet in length, and a 8-inch D.I.P. gravity main, approximately 600 linear feet in length. The project will also consist of a directional bore for the sewer gravity main and a Jack and Bore for a force main beneath the North Bypass (S US Hwy 76). The gravity sanitary sewer main will be open cut on the property of the school. The project will also include Horizontal Directional Boring for the force as seen on plans. Dalton Utilities will supply the package lift station, HDPE pipe, ductile iron pipe, fittings, gravel, manholes and valves for the project. The contractor will be responsible for supplying all other materials. The Contractor’s work also includes all erosion, sedimentation, and pollution control necessary for the project. The cost of any permits required for erosion control and land disturbing will be borne by the Owner. The Contractor will be responsible for the cost of any other permits or licenses required to complete the work. The Contractor will complete all necessary clean-up and restoration work to include filling, finish grading, grassing, landscaping, pavement repairs, driveway repairs, culvert repairs, drainage ditch restoration and other necessary restoration activities such that post construction conditions are Equal to or Better than those conditions that existed prior to any construction activity occurring. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |