Similar Projects
Bogert Place - Church to Story Street - SCR26 - City of Bozeman
Infrastructure
Conception
$402,000 est. value
Bozeman, MT 59715

Improvements to Existing Intercollegiate Student-Athletic Support Areas-Washington-Grizzly Stadium and the Adams Center
Infrastructure
Conception
$1,800,000 CJ est. value
Missoula, MT 59812

Y--GAOA - EMDD Fog Seal
Term Contract
Design
$100,000 to $250,000 est. value
Billings, MT 59101

Phase 1 Collection System Rehabilitation
Infrastructure
Design
$1,950,000 CJ est. value
Glendive, MT 59330

Blackfeet Reservation Apartment Complex
New Construction, Infrastructure
Bidding
$10,000,000 CJ est. value
Browning, MT 59417

Wilsall Water District Water System Improvements
New Construction, Renovation, Infrastructure
Bidding
$400,000 CJ est. value
Wilsall, MT 59086

Signal-12th and W Holly-Sidney
Infrastructure
Sub-Bidding
$6,000,000 CJ est. value
Sidney, MT 59270

MT-1 Slope Stability
Infrastructure
Sub-Bidding
$60,000 CJ est. value
Philipsburg, MT 59858

VRF Piping Replacement
Infrastructure
Post-Bid
Helena, MT 59601

Removal and Replacement of Road and Parking AC Pavement in Riverfront Park
Infrastructure
Post-Bid
Billings, MT

2021 Water System Improvements
Infrastructure, Alteration
Results
$4,051,000 est. value
Bigfork, MT 59911

106 US-12 Culvert - East of Baker
Infrastructure
Results
$759,515 est. value

Taft Stockpile Site - Sand/Salt Cover Structure
New Construction, Infrastructure
Construction
$310,000 CJ est. value
Taft, MT 59867

RFQ Design - Architect for Partnership Health Center
LEED Certification, New Construction, Build-out, Renovation, Infrastructure
Conception
$11,000,000 CJ est. value
Missoula, MT 59802

2022 North 7th Avenue Water Renovations
Infrastructure
Design
$427,000 CJ est. value
Bozeman, MT 59715

Last Updated 08/01/2022 02:33 PM
Project Title

Carpenter Creek Fish Barrier Project

Physical Address View project details and contacts
City, State (County) Neihart, MT 59465   (Cascade County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $355,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes construction of a fish barrier on Carpenter Creek including excavation, concrete footings, concrete walls and aprons, drains, rip rap and site reclamation. Engineers Project Cost Estimate: Approximately $355K

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents