Similar Projects
Last Updated | 01/20/2022 04:24 AM |
Project Title | Bridge Replacement - PPCB |
Physical Address | View project details and contacts |
City, State (County) | IA (Linn County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 0001 Items for a 232' X 30'-2 Pretensioned Prestressed Concrete Bridge Bros-swap-1452(601)--se-57 Route: 3rd St In the City of Coggon, on N 3rd St, Over Buffalo Creek, S3 T86 R06 8.00 Each Beams, Pretens. Prestr. Conc. 0.30 Acre Clearing & Grubbing 1,055.00 Square Yard Engineering Fabric 112.00 Cubic Yard Excavation Class 10 2,150.00 Cubic Yard Excavation Class 13 86.00 Cubic Yard Excavation Class 20 123.00 Cubic Yard Excavation Class 21 0.10 Acre Mulching 1,575.00 Linear Foot Pile, Steel H, 10 in. 518.00 Linear Foot Rail, Concrete Barrier 89,756.00 Pound Reinforcing Steel, Epoxy Coated 180.00 Square Yard Removal of Pvmnt/drives/sdwk 1,420.00 Ton Revetment 0.10 Acre Seeding & Fertilizing 200.00 Linear Foot Silt Fence 382.60 Cubic Yard Structural Concrete 3,068.10 Pound Structural Steel 25.00 Cubic Yard Topsoil, Strip/salvage/spread |
||||||||||||||||||||
Details | Bridge, New Construction.
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |