Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Upgrade Electrical System Area 2
Term Contract
Design
$1,000,000 to $5,000,000 est. value
Milwaukee, WI

Ventilation Improvements GPC
Infrastructure
Bidding
$9,422,000 est. value
Milwaukee, WI 53233

Ventilation Improvements GPC
Infrastructure
Bidding
$9,422,000 est. value
Milwaukee, WI 53233

Electrical Services
Term Contract
Post-Bid
Milwaukee, WI 53202

Wireless Access Points
Term Contract
Post-Bid
Milwaukee, WI 53205

Zeidler Municipal Building, 2nd Floor, Health Lab HVAC Upgrades
Results
Milwaukee, WI 53202

GMIA Electrical Switchgear Replacement
Results
Milwaukee, WI

Furnish and Deliver 400 HP Explosion Proof Electrical Motor
Alteration
Bidding
Milwaukee, WI

Testing, Certification, Preventive Maintenance, and Repair Services for Fume Hoods, Clean Rooms, Biosafety Cabinets, etc.
Term Contract
Post-Bid
Milwaukee, WI

Unit Heater Replacement
Results
Milwaukee, WI 53216

Purchase of Light Fixtures for South Division HS - Lobby 1-2 Lighting Upgrade
Post-Bid
Milwaukee, WI 53204

Preliminary Treatment Facility Electrical Upgrade
Results
Milwaukee, WI 53207

J059--Light Poles Removal/Replacement ONE TIME BUY
Post-Bid
Milwaukee, WI

OCC Dust Collector Replacement B121
Results
Oak Creek, WI 53154

Last Updated 03/10/2022 01:13 PM
Project Title

Ventilation Improvements MEP

Physical Address View project details and contacts
City, State (County) Milwaukee, WI 53233   (Milwaukee County)
Category(s) Single Trades
Sub-Category(s) Electric, HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Address conditions within the MSDF facility that have contributed to identified ventilation deficiencies and heat stress related issues for inmates and staff by expanding, enhancing, and unifying the existing ventilation equipment throughout the facility. Project includes air handling replacements and modifications. The air handling unit modifications include installation of chilled water coils and upgrading air filters in existing units. The chilled water system modifications and additions include installing new air cooled chillers, upgrading obsolete chilled water units and eliminating some less efficient direct expansion cooling units. The HVAC controls are being upgraded with new direct digital controls and upgrading pneumatic controlled devices to operate on direct digital electronic controls. Electrical additions and enhancements are required to support the new HVAC equipment.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents