Similar Projects
2022 Street Improvement Phase 1
Infrastructure
Bidding
Lake Geneva, WI

Delavan - Lake Geneva, Geneva National to Forest
Infrastructure
Bidding
$6,000,000 to $6,999,999 est. value
Delavan Lake, WI

2021 Seal Coating
Post-Bid
Delavan, WI

2021 Joint and Crack Filling
Infrastructure
Post-Bid
Lake Geneva, WI

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Twin Valley Road Improvements
Infrastructure
Post-Bid

Lake Geneva - Kenosha, CTH O - STH 75, 236th Avenue - 125th Avenue
Results
Kenosha, Lake Geneva, WI

2022 Elkhorn Street And Parking Improvements
Infrastructure
Post-Bid
Elkhorn, WI

2021 Multi Use Trail
Results
East Troy, WI 53120

2022 Street and Utility Improvements
Infrastructure
Post-Bid
Delavan, WI

Townline Road Reconditioning
Renovation
Results
WI

S and D Townline Road Reconditioning
Results
WI

TBR 2021-1 Creek Road Reconditioning
Renovation
Results
Delavan, WI 53115

CTH-ES (Main Street) West Street to STH-20
Results
Walworth, WI

Reported 04/07/2022 12:00 AM
Project Title

Crack Filling Various Town Roads

Physical Address View project details and contacts
City, State (County) Delavan, WI   (Walworth County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Crack Filling: Hot pour rubber Crack Fill material complying with ASTM 3405 specifications shall be supplied by the contractor. The total bid price should include routing all cracks to 1' x 1", blowing out all cracks, filling all cracks with Crack Filler, and smoothing over Crack Filler in all cracks. Any loose old crack filler needs to be removed and refilled. Existing crack filler that is cracked needs to be refilled. The following roads, in order of priority, are planned for this project: 1) Cobblestone Rd. - Hwy 11 to Amos Rd. 2) Dam Rd. - Arbor Ridge Dr. to Vintage on the Ponds at the top of the hill. Alternate: 1) Borg Rd - North Shore Dr. to Bridge 2) Countryside Dr. from Bailey Rd.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents