Similar Projects
Department Public Work Facility Repairs Phase 2 Roof, Siding, Insulation - City of Monona
Renovation
Conception
$1,540,000 CJ est. value
Monona, WI 53716

New Operations Facitily - Sun Prairie Utilities
New Construction - 82,500 SF
Design
$22,000,000 CJ est. value
Sun Prairie, WI 53590

$160M LRD Metal Fabrication, Refurbishment, and Installation Multiple Award Task Order Contracts (MATOCS)
Renovation
Design
$5,000,000 to $20,000,000 est. value

Rotunda - Plaster and Decor Finish Ceiling Panel Restoration
Renovation
Bidding
$475,400 CJ est. value
Madison, WI 53703

State Capitol Skylight Glazing Replacement Upgrades
Renovation
Bidding
$1,940,000 CJ est. value
Madison, WI 53703

Y-- (MATOC) for Design-Build Construction Services
New Construction, Renovation, Demolition
Post-Bid
$500,000 to $20,000,000 est. value

Valve Boxes
Term Contract
Post-Bid
Madison, WI 53715

SB Fuels Multiple Award Task Order Contract (MATOC)
Results
Less than $349,000,000 est. value
Washington, DC

Multiple Buildings Remodel - Administration Building
Renovation
Results
Sun Prairie, WI 53590

Headquarters Roof Replacement
Renovation, Infrastructure
Construction
$2,282,538 CJ est. value
Madison, WI 53703

Fourth Floor Gaming Remodel
Renovation
Construction
$184,392 CJ est. value
Madison, WI 53713

Plaza Deck Renovation, GEF 2 & 3
Renovation
Pending Verification
$1,392,700 CJ est. value
Madison, WI 53715

Twin Valley Boat Launch Renovation
New Construction, Infrastructure
Pending Verification
$460,800 CJ est. value
Madison, WI 53715

Dane County Jail South Tower Addition & Public Safety Building Renovation
Addition, Demolition, Renovation, Infrastructure - 170,000 SF
Design
$170,000,000 CJ est. value
Madison, WI 53703

Willard / Sommers / Center / Hudson / Miller Reconstruction
Renovation
Bidding
$117,000 CJ est. value
Madison, WI 53715

Last Updated 06/29/2023 12:16 PM
Project Title

Elvehjem Building Envelope Renovation - University of Wisconsin - Madison

Physical Address View project details and contacts
City, State (County) Madison, WI 53706   (Dane County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2024
Bids Due View project details and contacts
Estimated Value $8,169,227 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the work consists of removal of all of the bedface limestone on the 1st through 4th floors of the building and on the sloped roof above the 4th floor. Some additional cut stone will be removed and replaced. The stone will be replaced with new bedface limestone and new cut stone. In general, the work consists of removal of all of the bedface limestone on the 1 st through 4th 49 floors of the building andon the sloped roof above the 4 th 50 floor. Some additional cut stone will be removed and replaced. The stone will be replace with new bedface limestone and new cut stone. At the walls of the building, where stone has been removed, existing insulation will be removed and replaced with new insulation. At those same locations, a new vapor permeable air barrier will be installed. Roofing and insulation under the stone on the sloped roof will be removed and replaced with new rigid insulation, protection board, self adhering waterproofing and drainage mat. Existing copper gutters will be removed areplaced in-kind with new copper gutters. Skylights on the sloped roof and at the flat roof at the top of the building will be removed and replaced with new skylights. At a section of the sloped roof above the sloped skylights, existing flat-seamed, soldered copper roof and its substrate will be removed and replaced with new flat-seamed copper roof and new substrate materials. Sealants at the perimeter of windows and doors on the first two floors of the building will be replaced with new sealants. As of May 15, 2023, the awarded general contractor is looking for speciality demolition contractors for the removal of the skylight systems. Estimated construction start date is Early 2024.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents