Similar Projects
Kitchen, Bathroom and Plumbing Improvements
Alteration
Bidding
Bayonne, NJ 07002

Insulation Services on an As Needed
Term Contract
Post-Bid
Newark, NJ 07105

Building Envelope and Mechanical Insulation Improvements
Post-Bid
Pittsgrove, NJ 08318

Ceiling/Lighting Replacement
Results
Mendham, NJ 07945

Built-In Gutter and Cornice Restoration
Results
Somerville, NJ 08876

Blinds, Horizontal and Vertical
Post-Bid
Newark, NJ 07102

Tile Setting Services
Term Contract
Results
Hazlet, NJ 07730

Repair and Replacement of Deteriorating Gutters/Soffits - Repair to Interior Wall Damaged by Water Leaks
Post-Bid
Edison, NJ 08837

Furnish Deliver and Install Custom Cubicle ID Signs
Results
Newark, NJ 07102

Remove Existing Surfaces and Paint Floors
Post-Bid
Egg Harbor Township, NJ 08234

Site-190 Tenant Fit Up for Suite 201A at Toms River Regional Schools
Renovation - 1,727 SF
Results
Toms River, NJ 08753

Site Work at Gillette Manor
Renovation
Post-Bid
Sayreville, NJ 08872

Proposed Improvements at Various Schools
Results
Montclair, NJ 07042

Pioneer Hall and Heritage Hall Kitchen Countertop Upgrade
Post-Bid
Wayne, NJ 07470

Interior Improvements at Montague Township School
Results
Montague, NJ 07827

Last Updated 10/15/2021 03:05 PM
Project Title

Insulation System Installment

Physical Address View project details and contacts
City, State (County) McGuire AFB, NJ 08640   (Burlington County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Facilities Department requires installation of Foam Polyurethane (SPF) Insulation System for the Camp Bathroom. This project will be categorized as a Construction Project. The contractor will provide all labor, material and equipment necessary to remove and dispose of (in accordance with all federal, state and local regulations) the existing 6” fiberglass batting insulation and install a closed cell (SPF) spray polyurethane foam insulation system on approximately 3,250 square feet of ceiling of the existing galvalum type metal roof camp structure. The SPF (spray polyurethane foam) insulation system shall meet or exceed local, state and federal insulation code requirements to include a spray thermal barrier providing the required 15 minute thermal barrier for fire protection. Contractor will be responsible for determining the need for a primer application to existing metal roof/ceiling for proper adhesion. Contractor will also be responsible for providing all lift and or scaffolding systems to demo old insulation system and install spray foam insulation system on ceilings ranging from a height of 14’ to 17’ high.

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents