Similar Projects
Braford Avenue Pedestrian Bridge Painting
Renovation, Term Contract
Post-Bid
$125,000 est. value
Placentia, CA 92870

City Hall Nellie Weaver Hall Riley Gymnasium Exterior Painting
Alteration
Results
Newport Beach, CA

Irvine Ranch Water District Well Water Treatment System
Alteration
Post-Bid
$4,500,000 est. value
Orange, CA

Fire Hydrant Painting Services
Term Contract
Post-Bid
Orange, CA

Complete Exterior Painting at Various Sites
Alteration
Results
$490,000 est. value
Costa Mesa, CA 92626

Fullerton Union High School Exterior Painting
Alteration
Results
$550,000 est. value
Fullerton, CA 92832

Maintenance Painting at Various Sites
Alteration
Results
$200,000 est. value
Costa Mesa, CA

On-Call Painting Services
Alteration
Post-Bid
Newport Beach, CA

Exterior Painting - Multiple Sites
Alteration
Results
$300,000 est. value
Costa Mesa, CA

SB Minor B Striping Modification of Existing Crosswalk
Infrastructure
Post-Bid
$267,823 CJ est. value
Fullerton, CA 92832

Interior Painting at City Yard, Building A
Renovation
Results
$97,378 CJ est. value
Santa Ana, CA 92703

Streetlight Pole Painting and Restoration Services
Term Contract
Post-Bid
Newport Beach, CA 92663

Orange Coast College Student Success Center (4 Buildings) Painting Project
Renovation
Results
$122,000 CJ est. value
Costa Mesa, CA 92626

Multipurpose Room Interior Paint at Canyon High School
Renovation
Post-Bid
$300,000 CJ est. value
Anaheim, CA 92807

Summer Deferred Maintenance 2023 Painting Replacement at various sites
Renovation
Post-Bid
$500,000 CJ est. value
Tustin, CA 92780

Last Updated 03/24/2023 04:05 PM
Project Title

Campus Wide Exterior Paint Project at Irvine Valley College

Physical Address View project details and contacts
City, State (County) Irvine, CA 92618   (Orange County)
Category(s) Single Trades
Sub-Category(s) Painting
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $177,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Exterior Painting at Irvine Valley College (A400 ("LA"), BSTIC, B200 AND ANNEX, LSB, AND FMO). Exterior painting of several buildings on campus, including all related prep work and details, as specified. Work to include application of paint per specifications and include all exterior stucco areas, exterior/interior doors/frames, vents and grills, parapet caps, and all painted surfaces as illustrated in contract documents. Project Location: 5500 Irvine Center Drive, Irvine CA License Requirements B General Contractor OR C33 Painting and Decorating Type of Award-Lump Sum Start/Delivery Date-Estimated Start Date 5/30/2023 Project Duration-94 Calendar Days Bid Bond- 10.00% Payment Bond - 100.00% Performance Bond - 100.00% Online Q&A- Yes Q&A Deadline-03/02/2023 5:00 PM (PST) The Preliminary Cost Estimate to complete Project construction is $300,000.00

Details

Division 09 - Finishes, Painting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents