Similar Projects
Pleasure Bay Crossing and Main Pump Station Replacement
Design
$20,000,000 est. value
Monmouth Beach, NJ 07750

Wastewater Treatment Plant Effluent Pumping Station
New Construction
Bidding
$20,000,000 est. value
East Orange, NJ

Dublin Road Pump Station Variable Frequency Drive and Soft Start Replacement
Renovation
Bidding
$400,000 est. value
Jackson Township, NJ 08527

Garden Street Pump Station Upgrade
Renovation
Post-Bid
$1,500,000 est. value
Mount Holly, NJ 08060

Furnishing, Maintenance, Service and Repair of Ocean City Sewer Lift Station and Storm Water Pump Stations
Post-Bid
Ocean City, NJ

Pump Station No. 12 Infrastructure Upgrade
Results
$800,000 est. value
Little Silver, NJ 07739

Allison Drive Pump Station Replacement
Results
Cherry Hill, NJ 08002

DDTH Pumping Station Project
Construction
Kearny, NJ 07032

WWTP Sludge Handling System and Emergency Pump Station Improvements
Renovation, Addition
Construction
Long Branch, NJ 07740

Pump Station Replacements - Rockleigh Golf Course
New Construction
Bidding
$2,000,000 est. value
Rockleigh, NJ 07647

Wallington Pumping Station Rehabilitation Project
Renovation
Post-Bid
Wallington, NJ

Maintenance Service and Repair of Brigantine`S Water Wells Sewer Lift Stations and Storm Pump Stations
Results
Brigantine, NJ 08203

Harrison Avenue Pump Station Improvements
Renovation
Construction
Kearny, NJ 07099

Quarry Road Pump Station Improvements
Renovation
Bidding
$200,000 est. value
Hamburg, NJ 07419

Jersey Avenue Pump Station Replacement
Alteration
Post-Bid
$800,000 est. value
Metuchen, NJ 08840

Last Updated 07/18/2022 07:37 AM
Project Title

Maintenance Pump Station Repair Contract Statewide - 2022

Physical Address View project details and contacts
City, State (County) State-Wide: NJ
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The principal items of work consist of: Bridge Quantity Unit Description 1,700 Hour Lane Closures 3,700 Hour Repair Category “a” 3,600 Hour Repair Category “b”

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents