Similar Projects
Venson Senior Lofts
Addition, New Construction, Infrastructure, Renovation - 3,350 SF
Conception
$17,000,000 CJ est. value
Pittsburgh, PA 15210

Northview Heights Midrise Development
New Construction, Infrastructure
Design
$12,160,235 CJ est. value
Pittsburgh, PA 15214

1860 West Street Utilities and Site Package 1
Post-Bid
Munhall, PA 15120

Regional Roundabout Screening Study Consultant Services
Post-Bid
Pittsburgh, PA

Installation of 485` of 6" C900, DR14, PVC along Ruffner Lane
Results
Sewickley, PA 15143

Polyvinyl Chloride Water Pipe (PVC)
Results
Sewickley, PA 15143

SSW Somera Road Apartment Building Project
New Construction, Infrastructure - 350,000 SF
Construction
$50,000,000 CJ est. value
Pittsburgh, PA 15203

Pittsburgh Airport Innovation Campus Site Development Phase 2 at Pittsburgh International Airport
Infrastructure
Construction
Pittsburgh, PA 15231

Oakland Pride
New Construction, Infrastructure
Pending Verification
$19,000,000 CJ est. value
Pittsburgh, PA 15213

May Sterns Residential Development
Demolition, New Construction, Infrastructure - 3,632 SF
Pending Verification
$16,000,000 CJ est. value
Pittsburgh, PA 15206

Nebraska Avenue Waterline Replacement - Neville Township
Post-Bid
Pittsburgh, PA 15225

H247--Snow Melt Leak Detection Pittsburgh VAMC
Results
Pittsburgh, PA 15240

Castlegate Green / Mount Lebanon
New Construction, Infrastructure
Construction
$19,000,000 CJ est. value
Pittsburgh, PA 15226

Cedarwood Townhomes / Pittsburgh
New Construction, Infrastructure - 37,817 SF
Pending Verification
$12,000,000 CJ est. value
Pittsburgh, PA 15205

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Last Updated 08/25/2022 11:32 AM
Project Title

Bakerstown Culmerville Road WaterLine Extension

Physical Address View project details and contacts
City, State (County) Richland Township, PA 15044   (Allegheny County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $333,736 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work under generally includes construction of water system mains and encompasses the furnishing and installation of all equipment, material, labor, utilities, and services necessary for the complete construction of water main and including pipe, fittings, valves, hydrants, services, and appurtenances. The CONTRACTOR shall coordinate all construction with the OWNER and shall give the OWNER advance notification for valve shutoff, testing, disinfection and flushing of the new lines. All valves on the existing water system shall be operated only by employees of Richland Township Municipal Authority. Sequencing of waterline shutdown to facilitate testing shall be coordinated with the Authority. Contract Estimate: 2022-01 - $235,000 (Base Bid) 2022-01 - $50,000 (Add Alternate No. 1 - Betty Lane) 2022-01 - $40,000 (Add Alternate No. 2 - Carl Lane) CLARIFICATION DEADLINE 6/24/2022 3:00 PM

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents