Similar Projects
Site Drainage Improvement for Carlstadt PS
Infrastructure
Bidding
Carlstadt, NJ

Crescent Park Drainage Improvements
Post-Bid
Wallington, NJ 07057

Replacement of Blanch Avenue Culvert Over Dwars Kill Borough of Closter and Borough of Norwood Bergen County
Alteration
Post-Bid
Closter, NJ 07624

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Water Main, Sanitary Sewer and Storm Water Facility Repairs
Results
Fair Lawn, NJ 07410

Storm Drain Inlet Repairs
Term Contract
Post-Bid
Allendale, NJ

Yale Way Drainage Improvements
Results
Oakland, NJ 07436

Emergency Water Main and/or Storm and Sanitary Sewer Repairs
Infrastructure
Post-Bid
Oradell, NJ

Arrowhead Lane Culvert Replacement
Results
Saddle River, NJ 07458

Anderson Drainage Area Sewer Separation - Phase I CCTV
Infrastructure
Post-Bid
Hackensack, NJ 07601

Restoration of Huff Pond
Results
Montvale, NJ 07645

Twin Boro Park Improvements - Phase I
Renovation, Infrastructure
Post-Bid
Bergenfield, NJ

Maintenance Timber and Underwater Structural Repair Contract, North - 2021
Results
$5,000,001 to $10,000,000 est. value

Maintenance Stormwater Facilities Restoration Contract, North - 2021
Results
$10,000,001 to $20,000,000 est. value

Tenafly Culvert Repairs Project
Results
Tenafly, NJ

Last Updated 03/31/2022 08:21 AM
Project Title

Hudson Street (Water and Kennedy Streets) Stormwater Conveyance Improvements

Physical Address View project details and contacts
City, State (County) Hackensack, NJ 07601   (Bergen County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work will include but is not limited to, the cleaning and televising of approximately nine thousand seven hundred and twelve linear feet (9,712 LF) of stormwater piping and drainage structures within the Hudson Street and Kennedy Street, in addition to temporary traffic control, coordination of uniformed police traffic, disposal of removed materials and surface restorations. Pipe diameters may range in size from 6 inches to 42 inches, and box culvert of various dimensions.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents