Similar Projects
Massey Chapel Road Townhomes
New Construction, Infrastructure
Conception
$9,000,000 CJ est. value
Durham, NC 27713

Mockingbird Lane and Sherron Road Townhomes
New Construction, Infrastructure
Conception
$47,000,000 CJ est. value
Durham, NC 27701

Core Durham
New Construction, Infrastructure - 120,000 SF
Design
$23,000,000 CJ est. value
Durham, NC 27701

Core Durham
New Construction, Infrastructure - 120,000 SF
Design
$23,000,000 CJ est. value
Durham, NC 27701

Maryland Avenue Bridge Removal
Demolition, Infrastructure
Bidding
$476,269 CJ est. value
Durham, NC 27705

Maryland Avenue Bridge Removal
Demolition, Infrastructure
Bidding
$476,269 CJ est. value
Durham, NC 27705

Widens I-40 to A Six-Lane Facility From I-85
Post-Bid

North Carolina Central University Collaborative Learning and Research Center
New Construction, Infrastructure - 4,900 SF
Post-Bid
$3,000,000 CJ est. value
Durham, NC 27707

Pavement Preservation 2021
Results
Durham, NC

Public Works – Street Maintenance Repairs 2021
Infrastructure
Results
$1,259,430 est. value
Durham, NC

Northern Durham Convenience Site Construction
Construction
Less than $2,470,000 est. value
Rougemont, NC 27701

4800 Duraleigh Road Apartments
New Construction, Infrastructure
Construction
$90,000,000 CJ est. value
Raleigh, NC 27612

New Elementary School F Project
New Construction, Infrastructure - 108,000 SF
Pending Verification
$49,326,165 CJ est. value
Durham, NC 27713

New Elementary School F Project
New Construction, Infrastructure - 108,000 SF
Pending Verification
$49,326,165 CJ est. value
Durham, NC 27713

Wabash Parcels
New Construction, Infrastructure
Conception
$17,000,000 CJ est. value
Durham, NC 27701

Last Updated 11/11/2022 11:31 PM
Project Title

Bridge Repairs 2023

Physical Address View project details and contacts
City, State (County) Durham, NC 27701   (Durham County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $1,476,222 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 19, 2022, this project has not yet been awarded. A timeline for award has not yet been established. The Project involves the furnishing of all materials, labor, equipment, tools, et cetera, unless otherwise specified, to perform bridge repairs and preservation to the existing bridges as directed in the contract documents. Each bidder must be licensed under Chapter 87 of the North Carolina General Statutes. The City Council of the City of Durham reserves the right to reject any or all of the Bids. All bids must include a non-collusion affidavit. The City of Durham requires the Project to be completed in 240 calendar days from date of Notice to Proceed for construction.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents