Similar Projects
8th Street Improvements Motor City Way to Fountain Creek - City of Colorado Springs
Infrastructure
Conception
$1,625,119 CJ est. value
Colorado Springs, CO 80905

Airport Taxiway A Re-Alignment - City of Colorado Springs
Infrastructure
Conception
$14,200,000 CJ est. value
Colorado Springs, CO 80916

AutoZone #5811 / Colorado Springs
New Construction, Infrastructure - 6,500 SF
Design
$1,500,000 CJ est. value
Colorado Springs, CO 80908

Dublin North No. 5 Addition / Pikes Vista
New Construction, Infrastructure
Design
$16,974,000 CJ est. value
Colorado Springs, CO 80923

RFQ D/B - Consolidate Cadet Preparatory School Dormitory
Demolition, New Construction, Infrastructure
Bidding
$100,000,000 CJ est. value
US Air Force, CO 80840

Construction of US 24 and Meridian Road Improvements/Falcon Park and Ride
Infrastructure
Bidding
$500,000 CJ est. value
Falcon, CO 80831

National Chain Car Dealership / Colorado Springs
New Construction, Infrastructure - 6,827 SF
Post-Bid
$1,000,000 CJ est. value
Colorado Springs, CO 80922

Fire Station Support Building
New Construction, Infrastructure
Post-Bid
$25,000,000 CJ est. value
Fort Carson, CO 80913

New Sidewalk / Culvert Replacement
Infrastructure
Results
$563,198 est. value
Monument, CO

Manitou Springs Fire Station Driveway Demolition and Replacement
Demolition, Infrastructure
Results
Manitou Springs, CO 80829

Hampton Inn
New Construction
Construction
$2,000,000 est. value
Colorado Springs, CO 80900

South Academy Highlands Western Out Lots - Site Work
Infrastructure
Construction
Fountain, CO 80817

Victory Ridge Park
Infrastructure
Pending Verification
$1,000,000 CJ est. value
Colorado Springs, CO 80908

Whataburger / Colorado Springs
Infrastructure, Build-out - 3,800 SF
Pending Verification
$592,800 CJ est. value
Colorado Springs, CO 80918

Playground Renovation & Replacement - City of Colorado Springs
Renovation, Infrastructure
Conception
$800,000 CJ est. value
Colorado Springs, CO 80903

Last Updated 01/30/2023 05:36 PM
Project Title

RFP D/B - Brookmoor Pipe Rehabilitation Project - Slip Lining System

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO 80903   (El Paso County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2023 , Request For Proposals, Construction documents
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of January 30, 2023, no bids were received. No definite date for the rebid. Bid Intent Not Available Question Acceptance Deadline 12/14/2022 05:00 PM EST Questions which arise during the Response preparation period regarding issues around this Solicitation, purchasing and/or award should be directed electronically, via the Rocky Mountain E-Purchasing system, to Becky Schaffstein, CPPB, Lead Procurement Specialist, Contracts and Procurement Division, El Paso Count Questions are submitted online Yes El Paso County is issuing this Solicitation for the purpose of entering into a contract for services as specified herein from a Contractor(s) that will provide prompt and efficient service to the County for the Brookmoor Pipe Rehabilitation Project (Project). Services shall generally consist of design, and construction of the selected culvert liner as described in the specifications within this solicitation. General Requirements - Bid Deposit Required - Federally Funded - Insurance Required - License Required - Warranty Information Required - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % A. LINER PIPE DESIGN This work shall include the design of the HDPE liner pipe of the existing corrugated metal pipe. The culvert liner shall meet a minimum AWWA C906 DR 21 pressure rating. The new HDPE system will be smaller in diameter than the existing pipe and shall be situated in approximately the same alignments and profiles. An energy dissipating device may be required at outlet of the pipe, depending on design flow velocity from the new culvert liner per County ECM standards. The Contractor shall provide plans and specifications of the design for approval by the County, prior to beginning construction of the liner pipe. B. LINER PIPE INSTALLATION This work shall include installing an HDPE liner into an existing pipe and filling the space between the liner and the existing pipe with flowable fill material. Slope paving may be required in the manhole to match the flowline of the new HDPE liner. Prior to commencing the liner pipe installation, all jagged existing pipe edges or other deformities shall be repaired. All debris and foreign material shall be removed from the existing pipe and disposed of. A visual walkthrough inspection shall be performed after all debris and foreign material has been removed from the existing pipe in order to assess the current condition of the pipe. If visual inspection is not possible, a video inspection of the existing pipe shall be performed. A copy of the video inspection shall be provided to the Engineer. If, upon completion of the inspection of the existing pipe, the Contractor believes that they cannot proceed with the work as shown on the plans, the Engineer shall be notified.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents