Similar Projects
Lakeview Business Park
New Construction
Design
$1,500,000,000 est. value
Tooele, UT 84074

AutoZone #5860 / Stansbury Park
New Construction, Infrastructure - 6,500 SF
Design
$1,500,000 CJ est. value
Stansbury Park, UT 84074

Stansbury Park Improvement District Well No. 5 Transmission Water Line
Infrastructure
Bidding
$200,000 CJ est. value
Stansbury Park, UT 84074

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Udot AVL (Approved Vendor List)- Hot Mix Asphalt
Term Contract
Post-Bid

2021 Roadway Slurry Seal Project - Part 2
Infrastructure
Results
Tooele, UT

High Density Mineral Bond Installed
Infrastructure
Results
Tooele, UT

W & R Commercial Subdivision
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Tooele, UT 84074

Tagg N Go Car Wash / Tooele
New Construction, Infrastructure - 55,756 SF
Pending Verification
$1,000,000 CJ est. value
Tooele, UT 84074

IHC - Erda Roadway
Infrastructure
Post-Bid
Erda, UT 84074

Faust Road is 10.4 Miles of Soil Stabilization With Cement Treated Road base 24 Feet Wide
Infrastructure
Results
Tooele, UT

Breezeway Apartments
New Construction, Infrastructure
Pending Verification
$8,000,000 CJ est. value
Tooele, UT 84074

UDOT Pavement and Approach Slab Stabilization and Lifting AVL
Term Contract, Infrastructure
Post-Bid

Udot Region 4 Wash Rack Installation Various Locations
Term Contract, Infrastructure
Results

Presidents Park
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Grantsville, UT 84029

Last Updated 11/16/2022 07:33 AM
Project Title

I-80; Burmester to Begin Concrete Preservation High Volume

Physical Address View project details and contacts
City, State (County) Grantsville, UT 84029   (Tooele County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $1,572,423 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

County: Tooele This Project Requires Using the Electronic Certified Payroll Program. See Attachment to Notice to Contractors. This is a P+t (Price + Time) Project. The Department Will Not Hold Retention on This Project. Per Utah State Code A 13-8-5 (1) Prime Contractors Cannot Hold Retention. Refer to Utah Code A 13-8-5 (1) for More Information. Wage Rates: Apply Engineer's Estimate: Greater than $1.5M but less than or equal $3M Project Location: I-80; Burmester to Begin Concrete The principal items of work are as follows (for all items of work see attachment): Micro-Surfacing Emulsified Asphalt CQS-1P (NLR) Micro-Surfacing Asphalt Pavement Soft Spot Repair (Contingency) The project is to be completed: to be determined by competitive bid Project information can also be reviewed at the main office in Salt Lake City, its Region offices, and its District offices in Price, Richfield, and Cedar City. Each bidder must submit an electronic bid bond from an approved surety company using UDOT's Electronic Bid System (EBS); or in lieu thereof, cash, certified check, or cashier's check for not less than 5% of the total amount of the bid, made payable to the Utah Department of Transportation, showing evidence of good faith and a guarantee that if awarded the contract, the bidder will execute the contract and furnish the contract bonds as required. The right to reject any or all bids is reserved. Additional information may be secured at the office of the Utah Department of Transportation, (801) 965-4346 UDOT - I-80; Burmester to Begin Concrete Preservation High Volume *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents