Similar Projects
Olympus Master Plan
New Construction - 861,283 SF
Conception
$10,000,000 CJ est. value
Clermont, FL 34711

Waterset By Newland
New Construction
Conception
Apollo Beach, FL 33572

International Swimming Hall of Fame Complex
New Construction - 20,000 SF
Design
$70,900,000 est. value
Fort Lauderdale, FL

Highpointe PUD
New Construction - 588,000 SF
Design
Stuart, FL 34997

Construction of Softball Field Concession Building
New Construction - 1,487 SF
Bidding
Sanford, FL 32773

Construction Managers - Football Operations Facility
New Construction - 150,000 SF
Bidding
Tallahassee, FL

Sereno Subdivision, Phases 7A and 7B and Phases 8A and 8B
Post-Bid
Wimauma, FL

South Walton Athletic Facility Baseball Complex Project
Post-Bid
FL

Construction Management at Risk Services for the Cecil Airport Eastside Development Site
New Construction - 370,000 SF
Results
Jacksonville, FL 32221

Site Maintenance
Results
Newberry, FL 32669

Unifirst - Pompano Beach
New Construction, Addition - 9,056 SF
Construction
$1,200,000 est. value
Pompano Beach, FL 33069

Kindred - Phase 2
New Construction - 1,906,608 SF
Construction
Kissimmee, FL 34744

Sumter Villas
New Construction
Pending Verification
Bushnell, FL

Multipurpose Youth Sports Complex
New Construction
Pending Verification
$5,997,870 est. value
Green Cove Springs, FL

The Village at Town Center
New Construction, Renovation - 50,000 SF
Conception
Jacksonville, FL

Reported 03/30/2022 12:00 AM
Project Title

Sports Complex Phase 3 Project: Facilities Building and Associated Sitework

Physical Address View project details and contacts
City, State (County) Lynn Haven, FL 32444   (Bay County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Athletic Facility, Site Development
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect - 02/28/22
Owner View project details and contacts
Architect View project details and contacts
Description

The Work of this contract involves the completion of all Civil work described for Phase 3 of the Sports Complex total development. The scope includes: prepare building pad, place all concrete foundations and slabs, furnish and install metal building structure and exterior envelope including all windows and doors. New building footprint is approximately 9000 square feet. This value is not provided for estimating purposes only general scope information. Property is owned by The City of Lynn Haven, Florida. The owner has elected to furnish and install all interior framing, rough in, finishes and equipment for this project. Utility rough-ins will include slab rough-ins which the City has estimated it will take approximately 3 weeks to install once the contractor releases them to work on the building pad.

Details

Athletic Facility, New Construction.
Division 01 - General Requirements, Construction Facilities.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents