Similar Projects
Long Beach Streetscape Signage
Infrastructure
Bidding
$35,000 CJ est. value
Long Beach, MS 39560

Marshall Holly Springs Micro Seal
Infrastructure
Sub-Bidding
$2,000,000 CJ est. value
Holly Springs, MS 38635

Annual Contract for Concrete for Jackson County
Term Contract
Post-Bid
Pascagoula, MS

Twenty-Four Month Supply of Precast Concrete Manhole Sections and Reinforced Concrete Pipe
Term Contract
Post-Bid
Jackson, MS

Sidewalk and Concrete Maintenance
Term Contract
Results
Biloxi, MS

Concrete Installation and Repair
Alteration
Results
Ridgeland, MS

Pre-Stressed Spun Concrete Poles
Term Contract
Post-Bid
Tupelo, MS

Pre-Cast Concrete Drainage Structures Materials Only
Term Contract
Results
Ridgeland, MS

Concrete Services
Term Contract
Post-Bid
Madison, MS

Pre-Cast Concrete Drainage Structures Labor Only
Term Contract
Results
Ridgeland, MS

Annual Contract for Recycled Concrete
Term Contract
Post-Bid
Pascagoula, MS

Fy21 Shil Concrete Placement Inside Battery Area
Term Contract
Results
$8,000 to $18,000 est. value
Corinth, MS 38834

Supplies and Materials - Concrete Slabs, Limestone Rock
Infrastructure, Alteration
Post-Bid
MS

Historic Senatobia High School Phase 2 Restoration
Renovation
Results
$298,864 CJ est. value
Senatobia, MS 38668

2022 Brandon Amphitheater Concrete Repair Project
Alteration
Post-Bid
Brandon, MS 39042

Last Updated 10/17/2022 02:03 PM
Project Title

Office Renovation On 2nd Floor & Conference Room Renovation Lee Hall

Physical Address View project details and contacts
City, State (County) Starkville, MS 39759   (Oktibbeha County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

A. Work Covered: Work covered by the Contract Documents is as shown in drawings and described in words in the Project Manual. The Project Title and location is indicated on the first page of the Project Manual. B. Start of Work: Work shall be started immediately upon issuance of a Notice to Proceed. Prior to this, all Contracts and beginning documents will have been executed and insurance in force. C. Time of Completion: The completion of this Work is to be on, or before, the time indicated in the Standard Form of Agreement Between the Owner and the Contractor. PDC# 305-530 The right is hereby reserved to waive informalities. Mississippi State is an equal opportunity/affirmative action employer.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents