Last Updated 01/15/2020 01:03 PM
Project Title

Construction Manager at Risk (CMAR) for Aquifer Storage and Recovery Wells Loop 101 and Hayden

Physical Address View project details and contacts
City, State (County) Scottsdale, AZ   (Maricopa County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $15,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction Manager at Risk (CMAR) to provide design phase and the complete construction phase services for the City of Scottsdale`s Aquifer Storage and Recovery Wells Loop 101 and Hayden project. This project will review the improvement plans, provide value engineering and constructability review and provide construction management of the proposed improvements and drilling subcontractor. This project will provide the City with four (4) new wells to recharge the existing aquifers with water from the City`s potable water distribution system and recover water for treatment by the City`s existing treatment facilities.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents