Similar Projects
500 North - 700 East to 900 East - City of Provo
Infrastructure
Conception
Provo, UT 84601

500 West - 1560 South to 920 South
Alteration
Conception
$1,800,000 est. value
Provo, UT 84601

2022 Santaquin Center Street Storm Drain Improvements Project
Infrastructure
Design
$883,409 CJ est. value
Santaquin, UT 84655

2022 Santaquin Center Street Storm Drain Improvements Project
Infrastructure
Design
$883,409 CJ est. value
Santaquin, UT 84655

Utah Valley University Engineering Building
New Construction, Infrastructure
Bidding
$88,148,000 CJ est. value
Orem, UT 84058

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Power Department Building
Results
Salem, UT 84653

Power Building Site Work
Results
Salem, UT 84653

American Fork Multifamily - Offsite Work
New Construction
Construction
American Fork, UT 84003

The Crossing
New Construction
Construction
Saratoga Springs, UT 84045

Low Book Sales Dealership Expansion
New Construction, Alteration
Pending Verification
Lindon, UT 84042

East Center Street Townhomes
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Spanish Fork, UT 84660

24" Transmission Line 1730 North - 1500 West to 1680 North Geneva - City of Provo
Infrastructure
Conception
$8,000,000 est. value
Provo, UT 84603

Harvey Well Deepening Project
Infrastructure
Design
$170,000 CJ est. value
Cedar Hills, UT 84062

Last Updated 10/24/2022 08:11 AM
Project Title

Lateral Pipeline Connections 2022

Physical Address View project details and contacts
City, State (County) Mapleton, UT 84664   (Utah County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The deadline for submitting questions is TUESDAY OCTOBER 18, 2022 AT 12:00 PM (NOON).

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents