Similar Projects
Water Softening System
Infrastructure
Bidding
Mount Vernon, GA

Drinking Water Filteration System
Renovation, Infrastructure
Bidding
Waynesboro, GA

Harbins Park Well Services
Post-Bid
Dacula, GA 30019

2020 Water System Improvements - Andrews Well 2
Post-Bid
Carnesville, GA 30521

Pump Repair Service
Term Contract
Results
Atlanta, Chamblee, Decatur, Ellenwood, Lithonia, Snellville, Stone Mountain, Tucker, GA

Pump Repair Service
Term Contract
Results
Atlanta, Chamblee, Decatur, Ellenwood, Lithonia, Snellville, Stone Mountain, Tucker, GA

Well Inspection and Pipe Modification
Infrastructure
Bidding
Pembroke, GA

Deep Well and Chemical Feed Building
Post-Bid
Less than $600,000 est. value
Pavo, GA 31778

Variable Speed Pump System and Installation
Results
Albany, GA 31701

Gill Street Well Improvements
Post-Bid
Ellaville, GA

2020 Water System Improvements
Results
Less than $25,637 est. value
Carnesville, GA 30521

N041--509-20-4-5102-1054 Heating Water Pump in Room GG100
Post-Bid
Augusta, GA 31021

Wet Well Cleaning and Disposable Services
Results
Morrow, GA 30260

N041--509-20-4-5102-1054 Heating Water Pump in Room GG100 (VA-20-00076166)
Post-Bid
Augusta, GA 30904

Forrester Parkway, 1,000 GPM Deep Well
Results
Less than $725,000 est. value
Leesburg, GA 31763

Last Updated 08/16/2021 09:27 AM
Project Title

High Service Pumps 1 and 2 Rebuild

Physical Address View project details and contacts
City, State (County) Conyers, GA 30013   (Rockdale County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of the removal/installation of 2 high service pumps(P-8-1and P-8-2).Located in the High Service Building at 3090 Gees Mill Road Conyers Ga. 30013.Removal and rebuild of the pumps, and re-installation. Perform startup as conditions allow and perform vibration test for base line(working with Operations and Maintenance staff). Check for leaks and proper operation. Removal and re-build of one (1) pump at a time to keep operation status of the Water Treatment Plant.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents