Similar Projects
2021 WWTF Upgrade
Bidding
Merrillan, WI

Digester Cover Rehabilitation Project
Renovation
Bidding
Waupaca, WI

Rest Area 106 Wastewater Upgrade
Post-Bid
Dickeyville, WI 53808

Wastewater Treatment Facility Expansion
New Construction
Post-Bid
Kaukauna, WI 54130

Aeration System Upgrades
Results
South Wayne, WI 53587

Cornell WWTP Facility Improvements
Results
Cornell, WI 54732

2020 Waste Water Treatment Facility Sludge Dewatering System Improvements
Post-Bid
Less than $500,000 est. value
Portage, WI 53901

2020 WWTF Upgrade
Results
Less than $5,400,000 est. value
Palmyra, WI 53156

Water Treatment Services
Term Contract
Post-Bid
Black River Falls, WI 54615

Wastewater Treatment Facility Phase I Improvements
Results
Egg Harbor, WI 54209

CSTP 5 Improvements
Post-Bid
Superior, WI

Barneveld WWTF Upgrades
Results
Barneveld, WI

Wastewater Treatment Plant Clarifier Rehabilitation Project 2021
Term Contract
Post-Bid
Waupaca, WI 54981

WWTF Chemical Phosphorus Removal Upgrade
Results
Brownsville, WI 53006

WTF Chemical Feed Systems Improvements
Post-Bid
North Freedom, WI 53951

Last Updated 12/18/2020 01:00 AM
Project Title

Scum Concentrator Overhaul and Scum Press Replacement

Physical Address View project details and contacts
City, State (County) Oak Creek, WI 53154   (Milwaukee County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scum Concentrator Overhaul Remove the existing the drive motor, speed reducer, all sprockets, chains, shafts, bearings and flights from the scum concentrator unit. Steam clean, blast clean and epoxy coat the scum concentrator decant tank. Furnish and install new drive motor, speed reducer, sprockets, chains, shafts, bearings and flights on the scum concentrator unit as specified. Balance and align the drive system as installed under normal operating conditions. Complete 7-day test run. Scum Dewatering Press Replacement Remove the existing spiral scum dewatering press unit in its entirety, including the drive mechanism. Furnish and install a new spiral scum dewatering press and drive mechanism. Reconnect all piping and electrical connections. Balance and align the new spiral scum dewatering press as installed under normal operating conditions. Complete 7-day test run.

Details

Division 46 - Water and Wastewater Equipment, Residuals Thickening Equipment, Scum Concentrator Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents