Similar Projects
American Cementing - Bulk Plant / Building Expansion
Addition, Demolition, Infrastructure - 9,375 SF
Design
$700,000 CJ est. value
Marshall, TX 75672

American Cementing - Bulk Plant / Building Expansion
Addition, Demolition, Infrastructure - 9,375 SF
Design
$700,000 CJ est. value
Marshall, TX 75672

Seal Coat
Infrastructure
Post-Bid
Hallsville, Marshall, TX 75672

North Marshall Industrial Avenue Reconstruction
Infrastructure
Post-Bid
Marshall, TX 75670

2021 Group Seal Coat Program
Results

2021 Street Improvement Program
Infrastructure
Results
$1,468,558 est. value
Marshall, TX

QuikTrip #7906 / Marshall
New Construction, Infrastructure - 8,292 SF
Construction
$1,000,000 CJ est. value
Marshall, TX 75672

QuikTrip #7906 / Marshall
New Construction, Infrastructure - 8,292 SF
Construction
$1,000,000 CJ est. value
Marshall, TX 75672

Marshall Christian Academy Campus
Demolition, New Construction, Infrastructure
Pending Verification
$12,000,000 CJ est. value
Marshall, TX 75672

Marshall Christian Academy Campus
Demolition, New Construction, Infrastructure
Pending Verification
$12,000,000 CJ est. value
Marshall, TX 75672

Agriculture Complex Meat Lab Parking Lot
Alteration
Post-Bid

Business Park Grading Plan
Infrastructure
Results
$3,600,000 est. value
Marshall, TX 75672

Resurfacing of the MHS Band Parking Lot
Infrastructure
Post-Bid
Marshall, TX 75670

IH0020 - Mill and Inlay
Infrastructure
Results
$4,077,500 est. value
TX

Marshall Readiness Center Sanitary Sewer
Infrastructure
Post-Bid
$350,000 CJ est. value
Marshall, TX 75672

Last Updated 10/04/2022 03:19 PM
Project Title

Mulberry Springs Baptist Church New Sanctuary

Physical Address View project details and contacts
City, State (County) Hallsville, TX 75650   (Harrison County)
Category(s) Commercial, Heavy and Highway, Religious/Funeral
Sub-Category(s) Office, Paving/Reconstruction, Religious Facility, Sidewalks/Parking Lot, Site Development, Warehouse/Storage
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes a new pre-engineered metal building sanctuary facility with classrooms, offices, and restrooms. Parking lot expansion and site sidewalks also are included in the scope. As of October 4, 2022, this is on hold. A general contractor for framing/shell work has been chosen, but interior construction inquiries are currently being accepted through the owner. Please email office@mulberrysprings.org. A construction timeline hasn't been confirmed, but work could start in Q2 2023.

Details

19,800 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Ornamental Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Door Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Parking Control Equipment, Religious Equipment.
Division 12 - Furnishings, Religious Art, Window Treatments, Casework, Specialty Casework, Religious Casework, Rugs and Mats, Office Furniture, Fixed Audience Seating, Pews and Benches.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents