Similar Projects
Overland Park Arboretum Nature Trail - City of Overland Park
Infrastructure
Conception
$3,050,000 est. value
Bucyrus, KS 66013

Fire Station Number 6 - FM-22-1811 - City of Lawrence
New Construction, Infrastructure
Conception
$6,000,000 CJ est. value
Lawrence, KS 66044

Ridgeview Corporate Centre
New Construction, Infrastructure - 245,000 SF
Design
$141,500,000 CJ est. value
Olathe, KS 66061

Ridgeview Corporate Centre
New Construction, Infrastructure - 245,000 SF
Design
$141,500,000 CJ est. value
Olathe, KS 66061

Ulysses Airport - Rehabilitate Runway 17-35
Infrastructure
Bidding
$500,000 CJ est. value
Ulysses, KS 67880

Reconstruct Roads, Signage Improvements and Gate Fort Scott National Cemetery
Infrastructure
Bidding
$1,000,000 CJ est. value
Fort Scott, KS 66701

Andover Fire Station #2 - Bid Package #1
New Construction, Infrastructure
Sub-Bidding
$2,000,000 CJ est. value
Andover, KS 67002

Blue Valley Recreation Commission Sports Complex Drainage Improvements
Infrastructure
Post-Bid
Overland Park, KS

Great Bend Police Station and Court Facility
New Construction, Infrastructure
Post-Bid
$8,000,000 CJ est. value
Great Bend, KS 67530

Oakhill Storm Drainage Improvements
Infrastructure
Results
Lenexa, KS

109th Street and College Boulevard Storm Drainage Repairs
Infrastructure
Results
Lenexa, KS 66219

Chick-Fil-A - Galleria 115 / Overland Park
New Construction, Infrastructure - 4,989 SF
Construction
$1,500,000 CJ est. value
Overland Park, KS 66211

Pizza Hut / Olathe
New Construction, Infrastructure - 1,880 SF
Pending Verification
$570,000 CJ est. value
Olathe, KS 66062

Boulder Springs IV
New Construction, Infrastructure
Pending Verification
$12,000,000 CJ est. value
Spring Hill, KS 66083

RFQ Engineering - Barton Drive - Johnson Drive to 60th Street
Infrastructure
Conception
$1,500,000 CJ est. value
Shawnee, KS 66203

Last Updated 08/22/2022 07:03 PM
Project Title

Pin Tail March Rehab

Physical Address View project details and contacts
City, State (County) Hartford, KS 66854   (Lyon County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $150,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Eng Project # 21-042 Pin Tail March Rehab Location: Flint Hills National Wildlife Refuge Hartford, KS 66854 in Lyon County 1. 100% Small Business Set-aside, NAICS Code 237310 - Highway, Street, and Bridge Construction. | NAICS Association, Size Standard $39.5M. This solicitation is a request for proposal under FAR Part 13 Simplified Acquisition Procedures and awarded as a firm-fixed price construction contract. All reference to discussions shall not be interpreted under FAR Part 15, but rather indicates that the Government may communicate with offers as allowed under Simplified Acquisition Procedures. 2. IAW FAR 36.204 the magnitude of this construction project is anticipated between 100k and 150k. 3. Contractors shall follow instruction in section L of the solicitation. A responsive proposal shall consist of at minimum a Price Proposal, Technical Approach and Relevant Past Performance. 4. Any request for information or request for a site visit must be received no later than 12 August 2022 via e-mail at miguel_martinez@fws.gov by 12:00 PM MST. 5. Proposals must be received via e-mail to Miguel Martinez at miguel_martinez@fws.gov no later than 22 August 2022 by 5:00 PM MST. Delivery: 90 Days After Notice to Proceed Delivery Location Code: 0008350213 FWS FLINT HILLS NWR 530 W. Maple Avenue HARTFORD KS 66854 US Period of Performance: 09/01/2022 to 12/01/2022 00010 Replace WCS at Pin Tail March with concrete box culvert. Furnish all labor, materials, and equipment to complete the following work in accordance with statement of work and drawings herein. POP is 90 days from Notice to proceed *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents