Similar Projects
Main Street Mixed-Use Development
New Construction, Infrastructure - 36,000 SF
Design
$10,000,000 CJ est. value
Madison, MS 39110

Madison Medical Office / Madison
New Construction, Infrastructure - 99,000 SF
Design
$30,000,000 CJ est. value
Madison, MS 39110

Reunion Parkway Phase 2 Project
Infrastructure
Bidding
$31,000,000 CJ est. value
Canton, MS 39046

Intersection Improvements on US 51
Infrastructure
Bidding
$5,000,000 CJ est. value
Canton, MS 39046

Southwood Drive Drainage Imporvement Project
Infrastructure
Post-Bid
$300,000 CJ est. value
Canton, MS 39046

Madison County Shooting Range
Infrastructure
Post-Bid
$50,000 CJ est. value
Flora, MS 39071

Alliance Fire Station
New Construction, Infrastructure
Results
$3,674,000 CJ est. value
Canton, MS 39046

Canton High School Field and Track
Infrastructure
Results
$2,487,800 CJ est. value
Canton, MS 39046

Newmark Healthcare
New Construction, Infrastructure - 99,000 SF
Pending Verification
$30,000,000 CJ est. value
Madison, MS 39110

Clark Beverage Group Warehouse/Distribution Center
New Construction, Infrastructure - 400,000 SF
Pending Verification
$100,000,000 CJ est. value
Canton, MS 39046

Madison County Schools New Tennis Complex
New Construction, Infrastructure
Bidding
$950,000 CJ est. value
Madison, MS 39110

Construction of a Firing Range With Earthe
New Construction, Infrastructure
Post-Bid
$500,000 CJ est. value
Canton, MS 39046

Football Field Turf and Track Replacement Velma Jackson High School
Renovation, Infrastructure
Results
$1,920,800 CJ est. value
Camden, MS 39045

The Oaks Residence - Assisted Living Facility
New Construction, Infrastructure - 23,383 SF
Pending Verification
$7,000,000 CJ est. value
Flora, MS 39071

Camden Road Bridge Rehabilitation Project
Infrastructure
Bidding
$600,000 CJ est. value
Camden, MS 39045

Last Updated 08/16/2023 01:39 PM
Project Title

New Waterwood Water Well

Physical Address View project details and contacts
City, State (County) Ridgeland, MS 39157   (Madison County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $2,464,273 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 16, 2023, project was awarded to Thompson Brothers Drilling, Inc, awarded amount is $2,464,272.93. The work shall consist of, but not be limited to, the following: 1) Clearing and Preparation of Well Site; 2) Drilling of a Pilot Hole and Logging; 3) Constructing a test well and pulling a water sample; 4)Construction of a Permanent Well complete with outer casing, screen and inner casing, vertical turbine pump, column and motor; 5) Furnish and install above ground piping and appurtenances as required; 6) Furnish and install electrical, chemical feed systems and housing; 7) Furnish and install diesel generator; 8) Furnish and install SCADA equipment matching the existing system; 9) Tie in well to system as directed; and 10) all other items of work necessary for a complete and functioning well. The well is anticipated to be 1,100 feet deep and should produce a minimum 1,200 GPM or as directed. The project is on District property in Rankin County, Mississippi. The DISTRICT reserves the right to reject any or all bids and to waive any informalities or irregularities therein. No Bidder may withdraw his bid within sixty (60) calendar days after the actual date of the opening thereof.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents