Similar Projects
Metropolitan Transportation Center - Roof Replacements
Post-Bid
Atlanta, GA 30310

Task Order For Roofing Repair And Maint
Post-Bid
Lawrenceville, GA 30043

Residential Roof Repair For (10) Ten Houses
Results
Macon, GA

Residential Roof Repair For (10) Ten Houses
Results
Macon, GA

Design Services for Roof Replacement
Post-Bid
Reidsville, GA

Roofing Contractor Services
Results
GA

Roofing Replacement for Temple High School
Post-Bid
Temple, GA 30179

Eastside Elementary School Re-Roofing
Results
Less than $395,450 est. value
Senoia, GA 30276

Roofing Replacement for Villa Rica Elementary School
Post-Bid
Villa Rica, GA 30180

Roof Replacement for Adult Detention Center
Results
Less than $1,109,000 est. value
Canton, GA 30115

Requesting Roof Shade Structure
Post-Bid
Fort Benning, GA

Stanley Hall Reroofing
Results
Columbus, GA 31907

Grayson Library Roof Repair
Post-Bid
Grayson, GA 30017

Repairs To Cohutta Elem Gymnasium
Results
Less than $660,896 est. value
Cohutta, GA 30710

Antioch Roof Replacement
Results
Less than $844,875 est. value
Dalton, GA 30721

Last Updated 08/30/2022 01:09 PM
Project Title

McEachern High School Roof Replacement

Physical Address View project details and contacts
City, State (County) Powder Springs, GA 30127   (Cobb County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $701,713 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of removal of the existing roof system at McEachern HS, Buildings 5090 (Career Technology Center) and Building 5110 (Dobbs Hall), including all associated components down to the structural deck (5090 LWIC, 5110 Metal Deck) and replacement with a new modified bitumen roof system in accordance with the construction documents. The roof areas within the scope of this project are an approximate Building 5090 (Career Technology Center) 22,500 SF and Building 5110 (Dobbs Hall) 20,500 SF. Raising of existing HVAC Mechanical Roof Top units, curbs as necessary to accommodate the new finish roof height plus 8" minimum curb flashing height requirements. Extend all electrical, gas and duct supply lines if required to accommodate new curb height. Contractor's pre-qualification submittal should be emailed to Wendy Bell: wendy.bell@cobbk12.org. Bids must be accompanied by a bid bond made payable to the Cobb County School District, in the amount equal to five (5) percent of the bid price. (Certified Checks Not Acceptable.) The successful bidder will be required to furnish a Performance Bond and a Payment Bond acceptable to the Cobb County School District in an amount equal to 100 percent of the contract price and executed by a Surety Company licensed to do business in the State of Georgia and listed in the Department of the Treasury Circular 570, latest edition. The Surety Company shall have an A.M. Best Company minimum rating of "A-" with a financial size of VI "6" or better. Bonds must be accompanied by letter stating the bonding company's current rating for verification before acceptance by the Owner and execution of the formal Owner/Contractor agreement. Bonding of Subcontractors: Include in the Base Bid, Performance and Labor and Materials Payment Bonds, each in 100% of the subcontract sum, for each Subcontractor having a contract of $50,000.00 or more for Roofing, HVAC, Plumbing, Sprinkler System and Electrical Work as required by the General Conditions. Contractor and Subcontractors shall require the Attorney-in-Fact who executes bonds on behalf of sureties to attach a certified, current copy of his/her Power of Attorney. Cobb County School District reserves the right to award the project on whatever basis is in the interest of the Owner and to accept or reject any or all bids and to waive technicalities and informalities. All communications concerning these documents must be submitted through the CCSD Bonfire Interactive Portal. Only inquiries received by 3:00 PM ET on August 23, 2022 will be considered. Responses to all inquiries will be posted to the CCSD Bonfire Interactive Portal.

Details

43,000 SF.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents