Similar Projects
Monthly Pest Control for PCC
Post-Bid
Grafton, WV 26354

Building Materials and Supplies
Post-Bid
Grafton, WV

FAA Washington District Consolidated Services
Results
Washington, DC - Andrews Air Force Base, Baltimore, Hagerstown, MD - Chantilly, Leesburg, The Plains, VA - Martinsburg, WV 20176

Pest Control for the Salem Correctional Center
Results
Industrial, WV 26426

Custodial Services - Cumberland, Md (Md006) And Martinsburg, Wv (Wv026)
Post-Bid
Cumberland, MD - Martinsburg, WV

Facilities Support Services
Post-Bid
Triadelphia, WV 26059

Window Cleaning - Jean Dean Public Safety Building
Post-Bid
Huntington, WV 25701

Pest Control Services for Mildred Mitchell-Bateman Hospital
Post-Bid
Huntington, WV 25705

Heavy Equipment Labor Services
Post-Bid
Man, WV

Athletic Turf Field Products and Contracted Services
Post-Bid
Parkersburg, WV

Z1AZ--Capital Region Readiness Center (CRRC) Building Shell Services Recompete
Post-Bid
WV 25405

Exterminating and Pest Control for 209 Public Housing Units, and 5 Maintenance Buildings
Alteration
Post-Bid
Beckley, WV

Exterminating and Pest Control for 31 Multifamily Units
Alteration
Post-Bid
Beckley, WV 25801

Professional Engineering Services
New Construction, Infrastructure
Post-Bid
Huntington, WV

Pest Management
Term Contract
Post-Bid
WV

Last Updated 12/28/2021 03:44 PM
Project Title

R.D. Bailey Lake Herbicide Service

Physical Address View project details and contacts
City, State (County) Simon, WV (Mingo, Wyoming Counties)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all materials, supplies, and labor and apply herbicide in the following areas at R.D. Bailey Lake: - Entire downstream rock face of the dam and 100 feet beyond the abutments. - 25 feet beyond the abutments of the upstream concrete face of the dam. - Riprap areas along river channel below the dam. Exclude areas that have been grouted and covered in concrete. - 50 feet around the intake structure service bridge abutment (point where the bridge foundation terminates into the mountain). - Top of the cliff line at the Long Branch Overlook. - Hill below the Visitor Center. - Rock cliff on Visitor Center Road

Details

Division 01 - General Requirements, Temporary Controls, Temporary Pest Control.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents