Similar Projects
Wet Utilities Job Order Contract-Multiple Locations
Demolition
Design
$2,000 to $1,000,000 est. value
Washington, DC - Indian Head, Patuxent River, MD - Dahlgren, VA

Regional Maintenance of Grease Trap Services for Hampton Roads Virginia AOR
Term Contract
Design

Plumbing Maintenance and Repair Services at Norfolk Naval Shipyard, Portsmouth, Virginia AOR
Term Contract, Alteration
Bidding
Less than $800,000 est. value
Portsmouth, VA 23709

Septic and Well Assistance Program - Service Providers
Infrastructure
Bidding
Richmond, VA

FY21 Pipe Lining
Post-Bid
Roanoke, VA

Burlington #1158
Renovation
Post-Bid
Vienna, VA 22182

Donnagail Sewer Line Replacement
Results
Penn Laird, VA 22846

Manhole and Wet Well Rehabilitation and Related Services
Term Contract
Results
VA

Slipline Replacement 3 (Celadon Lane)
Infrastructure
Bidding
$2,000,000 est. value
Seven Corners, VA 22044

Grease Pumping
Term Contract, Infrastructure
Post-Bid
Mitchells, VA 22729

J--Option - Quarterly Grease Trap Services
Results
Portsmouth, VA

Onsite Sewage System Installation Project
Infrastructure
Bidding
$30,000 est. value
Ruckersville, VA 22968

Targeted Sanitary Sewer Point Repairs
Infrastructure
Post-Bid
Front Royal, VA

Troy Street Water and Sewer Facility Improvement
Results
VA

Installation of Alternative Onsite Sewage System
Infrastructure
Bidding
$400,000 est. value
Richmond, VA 23231

Reported 06/10/2022 12:00 AM
Project Title

Onsite Sewage System Installation Project

Physical Address View project details and contacts
City, State (County) Toano, VA 23168   (James City County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $210,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a water / sewer project in Toano, Virginia. Completed plans call for site work for a water / sewer project.Scope of work: Cost for Line Item #1 (include total cost for items A-J) These are known factors. Vendors must invoice for actual cost incurred as described herein. A) Construct an onsite sewage system that meets the location and construction specifications of the Sewage Handling and Disposal Regulations (12VAC5-610-10 et seq., the Regulations), and all other applicable state and local laws, regulations, and ordinances. B) Construct the above onsite sewage disposal system in compliance with the James City County Health Department (JCCHD) Construction Permit 147-21-0032 at 3018 Chickahominy Road Toano, Virginia 23168 in the location shown on the permit. The permit contains additional conditions, notes, and information needed to construct the onsite sewage system. C) Within 48 hours of signature of agreement to construct the onsite sewage disposal system, the contractor shall have the contents of the existing 1000 gallons septic tank serving the subject property pumped by a properly licensed sewer hauler. The contents of the exiting septic tank shall be pumped every 14 days up to one week prior to construction of the repair permit. The contents of the exiting septic tank shall be pumped every 48 hour for one week prior to installation of the repair onsite sewage system. D) As necessary, provide or subcontract with a licensed plumber and electrician to provide plumbing and electrical required to convey the wastewater from the house to the onsite sewage system as required by the Regulations, and the Virginia Uniform Statewide Building Code (VUSBC). This includes obtaining or assuring that the owner obtains all permits and inspections as may be required by the local building authority in compliance with the VUSBC. E) As necessary, provide or subcontract with a licensed plumber to provide plumbing required to relocate the existing water line 10 minimum from the onsite sewage system as required by the Regulations, and the Virginia Uniform Statewide Building Code (VUSBC). This includes obtaining or assuring that the owner obtains all permits and inspections as may be required by the local building authority in compliance with the VUSBC. F) Abandon any unused component of the former onsite sewage system as specified by the JCCHD Construction Permit 147-21-0032.The existing septic tank shall be pumped by a properly licensed sewage hauler, the tank crushed in place, lime placed over the crushed tank, and the tank hole filled with clean backfill material. G) Obtain a final installation inspection from the system designer, Larry Madison, Onsite Soil Evaluator and assure that the onsite sewage system complies with the Regulations. H) Provide all required documentation to the JCCHD following completion of construction and obtain an Operation Permit for the onsite sewage system. I) Follow all regulations and permitting pertaining to erosion and sediment control including stabilizing, seeding and grading the site after construction to return to the original state. Control construction runoff with proper practices so as not to become a nuisance to the owner or to neighboring properties or cause sediment to be discharged into state waters and drainage ditches. Any construction debris must also be removed from the site and disposed of properly. J) Bidders shall comply with all requirements of the Department of Professional and Occupational Regulations (DPOR) for contracting and executing the contract with the Virginia Department of Health. Must provide a copy of Class A or B contractors licenses from DPOR Board for Waterworks and Wastewater Works Operators and Onsite Sewage System Professionals and proof of insurance.Bidders contacted by VDH to provide any missing required documents, must provide the document within 24 business hours or their bid will be considered non-responsive. Additional Services (If Needed) Bidder must contact VDH Project Manager listed on the Notice to Proceed for approval prior to any additional services performed. VDH will issue a change order for actual additional services rendered. The contractor shall furnish all labor, supervision, equipment, tools, parts, supplies and materials, as necessary, to perform the services as described herein: A. Additional materials B. Additional labor and equipment. Breakdown of Total Cost When responding to solicitation Bidders must attach a document listing breakdown of total cost for line item 1. Bidders must attach a separate breakdown of cost for additional services. Additional cost should not be included in line item 1 bid submission. Additional questions: Contact Angelica Cipara via email: angelica.cipara@vdh.virginia.gov Notice to Proceed If Bidder is selected for award, the Bidder shall be required to provide a signed Notice to proceed form within 3 business days of notification. VDH will provide a form for signature.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents