Similar Projects
Equipment Operation and Maintenance for The Central Energy Building, Naval Health Clinic, MCAS Cherry Point Nc
Design
Cherry Point, NC

HVAC Replacement - Sheppard Memorial Library
Alteration
Bidding
Greenville, NC 27858

Ponderosa Elementary AC Replacements 2021
Alteration
Bidding
$2,000 to $30,000 est. value
Fayetteville, NC 28303

US Cellular Center Mechanical/HVAC Renovation
Post-Bid
Asheville, NC

HVAC - Holloway Center
Post-Bid
Kinston, NC 28501

Install 10 HVAC Systems in RHA Occupied Public Housing Community
Results
Rockingham, NC 28379

Install 20 HVAC Systems in RHA Occupied Public Housing Community
Results
Rockingham, NC 28379

McEniry HVAC and IT Infrastructure Upgrades
Construction
$10,000,000 est. value
Charlotte, NC 28223

Cliffdale Elementary Package AC Replacements
Alteration
Bidding
$2,000 to $30,000 est. value
Fayetteville, NC 28314

HVAC Replacements at Wilson Air North
Post-Bid
Charlotte, NC 28208

HVAC Repairs Rachel Freeman School of Engineering
Results
Less than $93,657 est. value
Wilmington, NC 28405

West Buncombe Elementary School Replace (2) Separated Combustion Makeup Air Handlers
Alteration
Bidding
Asheville, NC 28806

Design-Build Services for LED Lighting and HVAC Control Infrastructure Improvement
Post-Bid
Less than $10,000,000 est. value
Statesville, NC 28677

Noble Hall AHU Replacement
Results
Less than $365,000 est. value
Greensboro, NC

HVAC Filter Maintenance for Campus Wide and Satellite Locations
Term Contract, Alteration
Bidding
Jacksonville, NC 28546

Reported 08/11/2021 12:00 AM
Project Title

Southwest High School Chiller Replacement

Physical Address View project details and contacts
City, State (County) Pinetops, NC 27864   (Edgecombe County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $450,000
Plans Available from Engineer - 07/12/21
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes replacing older Air-Cooled Chillers with the same tonnage and a new chilled water pump. Controls and electrical will be modified as necessary to fit the new units. The building will be occupied during construction, and all required electrical and hydronic shutdowns are to be coordinated with the owner. Work is anticipated to be completed before March 18, 2022.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents