Similar Projects
Various Roads in Downers Grove Township
Infrastructure
Bidding
Downers Grove, IL

1. HFE 150; Furnished and Applied
Infrastructure
Bidding
Odin, IL

Goshen Road District Aggregate Supply
Post-Bid
IL

Gravel for Midewin
Post-Bid
Wilmington, IL 60481

215 Gallon Bituminous Materials Prime Coat Furnish and Apply
Results
Bridgeport, IL

Sealcoat & Aggregate
Results
Divernon, IL 62530

Seal Coat Aggregate
Post-Bid
Less than $41,736 est. value
Shabbona, IL 60550

Bituminous Materials Furnish and Apply
Results
Less than $29,527 est. value
Hord, Louisville, IL 62858

Multi-Year Contract for Aggregate Materials and Spoils Disposal
Term Contract
Post-Bid
Des Plaines, IL 60016

Bituminous Materials
Results
Less than $45,161 est. value
Smithton, IL

Purchase of Sand, Gravel, Stone, and Spoil Removal Services
Term Contract
Post-Bid
IL

2020 Aggregate Shoulder Improvements
Results
Bannockburn, IL 60015

2021 Water Conditioning Bulk Softener Salt
Term Contract
Post-Bid
Lake in the Hills, IL 60156

2020 Overlay
Results
Danville, IL 61832

Furnish and Delivery of Aggregate Materials
Post-Bid
Urbana, IL

Last Updated 08/19/2021 08:58 AM
Project Title

Aggregates Base Course

Physical Address View project details and contacts
City, State (County) Watseka, IL   (Iroquois County)
Category(s) Heavy and Highway
Sub-Category(s) Aggregates
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Agg. Base Course: 76 Sy; Preparation Of Base: 768 Sy; Agg. Base Repair: 198 Ton; Agg. For Temporary Access: 16 Ton; Bit. Materials (Tack Coat): 8,551 Pound; Leveling Binder (Machine Method): 198 Ton; Hot- Mix Asphalt Surface Removal - Butt Joint: 188 Sy; Hot-Mix Asphalt Surface Course, Mix "c": 1,402 Ton; Pcc Driveway Pavement, 6": 37 Sy; Pcc Sidewalk 5": 672 Sy; Detectable Warnings: 50 Sf; Hot-Mix Asphalt Surface Removal, 1 1/2": 11,970 Sy; Hot-Mix Asphalt Surface Removal, 2": 4,687 Sy; Driveway Pavement Removal: 50 Sy; Comb. Curb And Gutter Removal: 909 Foot; Sidewalk Removal: 693 Sf; Agg. Shoulders: 289 Sy; Valve Boxes To Be Adjusted: 7 Each; Frames And Grates: 3 Each; Comb. Concrete Curb And Gutter: 909 Foot; Thermoplastic Pavement Marking - Line 6": 101 Foot; Thermoplastic Pavement Marking - Line 24": 26 Foot; Class d Patches: 790 Sy; Topsoil Furnish And Place: 319 Sy; Sodding: 319 Sy; Hot-Mix Asphalt Driveway Pavement: 13 Sy; Drainage And Utility Structures To Be Adjusted: 23 Each; Drainage And Utility Structures To Be Reconstructed: 4 Each.

Details

Division 32 - Exterior Improvements, Common Work Results for Exterior Improvements, Aggregates for Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents