Similar Projects
US 11 - Utilities
Infrastructure
Conception
$1,000,000 CJ est. value
Ponca City, OK 74601

US 11 - Utilities
Infrastructure
Conception
$1,000,000 CJ est. value
Ponca City, OK 74601

Utilities - US 60
Infrastructure
Design
$1,000,000 CJ est. value
Ponca City, OK 74601

Utilities - US 60
Infrastructure
Design
$1,000,000 CJ est. value
Ponca City, OK 74601

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Tonkawa Tribe Infrastructure Improvement Water Project
Infrastructure
Bidding
$600,000 CJ est. value
Tonkawa, OK 74653

Utility Relocation Gate Valves
Infrastructure
Post-Bid

Drainage Improvements Project Joe Street, Phases 1 and 2
Infrastructure
Post-Bid
$300,000 CJ est. value
Ponca City, OK 74601

Water Line Improvement
Infrastructure
Results
Ponca City, OK 74604

Classroom Addition at Concert Hall
Addition, Demolition, Infrastructure - 110,711 SF
Results
$5,375,895 CJ est. value
Ponca City, OK 74601

Utilities - SH 132
Infrastructure
Design
$500,000 est. value

Blackwell CDBG Water Line Replacement 2019
Infrastructure
Post-Bid
$250,000 est. value
Blackwell, OK

Kaw Nation Housing Paving Project
Infrastructure - 5,400 SF
Results
$134,743 CJ est. value
Kaw City, OK 74641

Bridge Rehabilitation - US 60
Infrastructure
Design
$3,759,812 CJ est. value
Ponca City, OK 74601

RFQ Design - Development of Airport Project - Blackwell-Tonkawa Municipal Airport
Demolition, New Construction, Infrastructure
Post-Bid
$2,600,000 CJ est. value
Blackwell, OK 74631

Last Updated 02/16/2023 11:04 PM
Project Title

US 60 - Utilities

Physical Address View project details and contacts
City, State (County) Ponca City, OK 74601   (Kay County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $515,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Us 60: From Waverly St. In Ponca City E. 1.8 Miles to the Us 177 Jct. (Ut for O4) As of February 17, 2023, the project is in Final Planning status. Anticipated letting month/year is May , 2023. Length : 1.800 Mi. OKDOT - US 60 - Utilities *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents