Similar Projects
RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Pit Cleaning-Bascule Bridges, Multiple Services
Infrastructure
Post-Bid

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

0.76 MI of Hot Mix Asphalt Cold Milling and Resurfacing, Concrete Curb and Ramps, Adjust Drainage Structure Cover and Pavement Markings on Michigan Avenue from State Road to Woodlawn Avenue
Infrastructure
Results
Hastings, MI

2022 Whippoorwill/Greenwood Street Sanitary Sewer and Water Main Improvements and Village-Wide Sanitary Sewer CIPP Project
Infrastructure
Construction
$787,414 CJ est. value
Middleville, MI 49333

2022 Riverside Park Improvements
New Construction, Infrastructure
Post-Bid
$300,000 CJ est. value
Nashville, MI 49073

Asphalt Paving
Infrastructure
Results
MI

2023 Proposed Parking Lot 8 Reconstruction
Infrastructure
Post-Bid
$400,000 CJ est. value
Hastings, MI 49058

2022 Crack Seal Blocks
Infrastructure
Results
MI

TK Middle School Serving Line Renovation
Infrastructure
Post-Bid
Middleville, MI 49333

Pavement Repairs on M-37 and M-43 - MDOT Barry County
Infrastructure
Results
$600,000 est. value
Hastings, MI 49058

Cold Storage Facility
New Construction, Infrastructure - 320 SF
Post-Bid
$233,000 CJ est. value
Middleville, MI 49333

Hot Mix Asphalt Cold Milling and Resurfacing, Sidewalk Ramp Upgrades and Pavement Markings on M-66
Infrastructure
Results
$1,541,000 est. value
Nashville, MI

Hastings Area Schools - Pool Dehumidifcation Unit
Renovation, Infrastructure
Post-Bid
$530,000 CJ est. value
Hastings, MI 49058

Hall Lake Dam Rehabilitation/Gun Lake Road
Infrastructure
Results
$1,009,145 CJ est. value
Delton, MI 49046

Last Updated 05/23/2023 10:28 AM
Project Title

2023 Shared Use Pathway Extensions

Physical Address View project details and contacts
City, State (County) Thornapple Township, MI 49333   (Barry County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $1,920,135 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of furnishing all material and constructing the following: Approximately 10,300 lineal feet of 8-foot wide HMA Shared Use Pathway Approximately 1,120 lineal feet of 10-foot Treated Timber Boardwalk Approximately 1,400 square feet of Modular Concrete Block Retaining Wall Approximately 6,000 square yards of Slope Restoration, Type A All Necessary Appurtenances Including all necessary appurtenances and restoration. The work to be performed under this contract will be financed and paid for by funds received from Caledonia Township. A bid bond, certified check, or cashier's check payable to Caledonia Township in an amount equal to five percent (5%) of the total price shall accompany each bid. This surety shall bind the bidder for a period of forty-five (45) days after the receipt of bids. The contractor shall have The contractor shall have Sixteen (16) weeks in which to complete construction of the project between the issuance date of the Notice to Proceed and November 17, 2023. Contractor can pick the start date, however upon start of construction work must be completed within sixteen (16) weeks of his start and prior to November 17, 2023

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents