Similar Projects
Bethlehem Roadwork
Infrastructure
Design
$300,000 CJ est. value
Wheeling, WV 26003

Playground Bridge (Go Bond 2/3)
Demolition, New Construction, Infrastructure
Design
$1,734,000 CJ est. value
Triadelphia, WV 26059

New Fire Department Headquarters
New Construction, Infrastructure - 26,000 SF
Post-Bid
$4,000,000 CJ est. value
Wheeling, WV 26003

Overlay Bridge Deck W/modified Pcc - Elbys Br O/l
Infrastructure
Post-Bid
$600,000 CJ est. value
Triadelphia, WV 26059

Wheeling Park High School Track Facility Upgrades
Infrastructure
Results
$1,279,200 CJ est. value
Wheeling, WV 26003

Signing - I 70 DMS
Infrastructure
Results
$743,814 CJ est. value
Triadelphia, WV 26059

Market Street Retail
Demolition, New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Wheeling, WV 26003

Starbuck's & Retail
Demolition, New Construction, Infrastructure - 4,319 SF
Pending Verification
$1,200,000 CJ est. value
Wheeling, WV 26003

OH Line - Middle Creek
Infrastructure
Design
$2,000,000 CJ est. value
Triadelphia, WV 26059

Sidewalk Replacements Hil-Dar Community Apartments
Infrastructure
Post-Bid
$200,000 CJ est. value
Wheeling, WV 26003

Splash Pads
Infrastructure
Results
$1,375,850 CJ est. value
Wheeling, WV 26003

Dunkin / Wheeling
New Construction, Infrastructure - 2,000 SF
Pending Verification
$610,000 CJ est. value
Wheeling, WV 26003

Elm Grove Bridges
Infrastructure
Design
$5,171,366 CJ est. value
Wheeling, WV 26003

Elm Grove Elementary School Renovations and Addition
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$350,000 CJ est. value
Wheeling, WV 26003

North Park Sewer Improvements
Infrastructure
Results
$474,550 CJ est. value
Wheeling, WV 26003

Last Updated 06/05/2023 11:07 AM
Project Title

Hydraulic System Replacement, Pike Island Locks and Dam

Physical Address View project details and contacts
City, State (County) Wheeling, WV 26003   (Ohio County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $10,781,573 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of June 2023, this project has yet to begin, but is expected to start soon. Contract Award Date: Jan 09, 2023 Contract Award Number: W911WN23C8000 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: UM3PW6F8SCW1 Contractor Awarded Name: BCI Construction USA, Inc. Contractor Awarded Address: Pace, FL 32571-7304 USA Base and All Options Value (Total Contract Value): $10781573.13 The U.S. Army Corps of Engineers, Pittsburgh District, has a project that involves the replacement of the central hydraulic system for the Main and Auxiliary Lock Chambers at Pike Island Locks and Dam, Ohio River, West Virginia. The contract will include a new four-corner hydraulic system for each lock chamber consisting of Hydraulic Power Units (HPUs) for the miter gates and culvert filling/emptying valves. The new HPUs shall be located in new precast buildings at the following locations: Two (2) HPUs on the river wall; one upstream and one downstream for operation of the Main Chamber culvert valves and miter gates. Two (2) HPUs on the middle wall; one upstream and one downstream for operation of Main Chamber culvert valves and miter gates. In addition, the two HPUs on the middle wall are for operation of the Auxiliary Chamber miter gates. The modified four-corner system reduces the number of HPUs on the middle wall from four to two. Two (2) HPUs on the land wall; one upstream and one downstream for operation of the Auxiliary Chamber culvert valves and miter gates. The contract specifically includes: a.Installation of new power, control, and fiber optic cables for the six (6) HPUs. Includes modifying the existing control stations in each control shelter for the addition of the new HPUs and miter gate controls. Includes installation of a new operator control station in the middle wall Operations Building. b. Furnishing and installation of six (6) HPUs, stainless steel hydraulic piping, and hydraulic oil. c. Furnishing and installation of six (6) precast buildings which includes raised concrete pads, power distribution equipment, associated electronics and hardware, and new utility trench covers in various areas of the lock. d. Furnishing and installation of new Motor Control Center (MCC) distribution equipment. e. Demolition and disposal of existing central hydraulic system located in the middle wall Operations Building. This includes all motors, pumps, reservoir, filters, associated piping, and proper disposal of hydraulic oil. f. Demolition and removal of all existing central hydraulic oil lines on the river, middle, and land walls. This includes all lines for pressure and return to each miter gate and culvert valve cylinder. Removal and proper disposal of hydraulic oil and components will be required. Removal and proper disposal of electrical equipment will be required. Ferrous and all other construction waste material will be disposed of at commercially permitted facilities licensed to accept waste or recyclable materials as applicable. Construction work will occur in close proximity to waterway traffic and operating lock and dam gates. The existing lock chambers and dams are currently operated and staffed by Government personnel 24 hours a day 365 days of the year. Lock closures for installation and testing of new equipment will be required to be minimal and at the approval of Government. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml solNo=W911WN23B8005' to obtain more details.* Hydraulic System Replacement, Ohio River, Pike Island Locks and Dam NAICS 237990 - Other Heavy and Civil Engineering Construction w ith Small Business Size Standard $39,500,000.00. This project is being solicited as 100% Set-Aside for Small Business. BID AND BID MODIFICATIONS RECEIVED BY E-MAIL OR FACSMILE WILL NOT BE CONSIDERED. Magnitude of Construction is Betw een $5,000,000.00 and $10,000,000.00 ALL RESPONSES TO THIS ANNOUNCEMENT SHALL BE SUBMITTED ELECTRONICALLY VIA PROCUREMENT INTEGRATED ENTERPRICE ENVIRONMENT (PIEE). NOTE: BLOCK 13 REQUIREMENTS HAVE BEEN REVISED. SEE ADDENDUM TO SECTION 00 21 00 WITH INFORMATION REGARDING THE SUBMISISON AND OPENING OF BIDS. To submit and review Bid Inquiry Items, Bidders will need to be a current registered user or self-register into system. The Solicitation Number is: W911WN23B8005 The Bidder Inquiry Key is: 73BZ8K-24H32G *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Questions are due Friday, 02 December, 2022

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents