Similar Projects
Knapp Elementary School - 2020 Bond - Racine Unified School District
Infrastructure, Renovation
Design
$201,000 CJ est. value
Racine, WI 53403

Community Pathways Campus / Jefferson - 2020 Bond - Racine Unified School District
Renovation
Design
$2,029,927 CJ est. value
Racine, WI 53403

CPC 2 Elevator Replacements and New Mechanical Room
Renovation
Results
Caledonia, WI 53126

Goodland Elementary School Remodel - 2020 Bond - Racine Unified School District
Build-out, Infrastructure
Design
$14,824,036 CJ est. value
Racine, WI 53406

Fratt Elementary School Expansion and Renovation - 2020 Bond - Racine Unified School District
Addition, Renovation, Infrastructure
Design
$11,899,719 CJ est. value
Racine, WI 53405

Schulte Elementary School Replacement - 2020 Bond - Racine Unified School District
New Construction
Design
$5,000,000 CJ est. value
Racine, WI 53403

Red Apple Elementary School Replacement - 2020 Bond - Racine Unified School District
New Construction
Design
$5,000,000 CJ est. value
Racine, WI 53403

SC Johnson Elementary School Expansion and Renovation - 2020 Bond - Racine Unified School District
Addition, Renovation
Design
$18,877,625 CJ est. value
Racine, WI 53403

Mitchell K-8 School - 2020 Bond - Racine Unified School District
Addition, Infrastructure, Build-out, Renovation
Design
$31,633,727 CJ est. value
Racine, WI 53403

Jerstad-Agerholm K-8 - 2020 Bond - Racine Unified School District
Addition, Infrastructure, Build-out
Design
$50,211,400 CJ est. value
Racine, WI 53402

West Ridge Elementary School Remodel - 2020 Bond - Racine Unified School District
Build-out - 145,890 SF
Design
$47,103,622 CJ est. value
Racine, WI 53403

Bull Early Education Center - 2020 Bond - Racine Unified School District
Renovation, Infrastructure
Design
$1,046,632 CJ est. value
Racine, WI 53403

Dr. Jones Elementary School - 2020 Bond - Racine Unified School District
Renovation
Design
$500,000 CJ est. value
Racine, WI 53403

Julian Thomas Elementary School - 2020 Bond - Racine Unified School District
Infrastructure, Renovation
Design
$3,131,337 CJ est. value
Racine, WI 53403

Olympia Brown Elementary School - 2020 Bond - Racine Unified School Districct
Renovation, Infrastructure
Design
$11,694,400 CJ est. value
Racine, WI 53402

Last Updated 01/06/2023 11:03 AM
Project Title

Wadewitz Elementary School Expansion and Remodel - 2020 Bond - Racine Unified School District

Physical Address View project details and contacts
City, State (County) Racine, WI 53404   (Racine County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected May 2025
Bids Due View project details and contacts
Estimated Value $20,343,198 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of January 6, 2023, a construction manager has been selected and this project is in the planning phase. Information regarding an architect has not been released. Construction is expected to begin in May of 2025 and complete in August of 2027. Bond fund $598 million of work over 30 years The referendum would provide the funding needed to make the following improvements at Wadewitz: SAFETY & SECURITY: • Update for ADA-compliant access • Replace fire alarm, clock and PA systems • Install emergency backup generator LEARNING SPACES: • Create Art Classroom and STEM Lab • Remodel Special Education spaces and create two Sensory Rooms • Create breakout spaces and right-size classrooms • Repurpose existing spaces to create Community Room • Relocate and remodel kitchen near cafeteria NEW ADDITIONS: • Construct a new gymnasium, music and band addition INFRASTRUCTURE: • Refresh building interiors (LED lighting, flooring, ceilings, casework, paint walls) • Address building maintenance (doors, HVAC updates, plumbing, roofing, exterior masonry, asphalt/concrete and retro-commissioning of pool and HVAC system) • Repair pool equipment The 2020 bond referendum was passed and approved by the voters on April 7, 2020.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents