Similar Projects
Water Plant No. 1 Replacement Well
Infrastructure
Bidding
TX

Pump, Submersible, 2", Discharge, Trash
Post-Bid
Houston, TX 77251

MHF80 Single Stage Vacuum Pump
Post-Bid
Houston, TX 77251

Water Well No. 2
Results
TX

J045--Reline Main Irrigation Well and Replace Vertical Turbine Pump at Houston National Cemetery. Project Number 851-NRM20-203
Results
$100,000 to $250,000 est. value
Houston, TX

Lift Station Wet Well and Discharge Pipe Coating
Post-Bid
TX

Proposed Water Well No. 3 for Memorial MUD Water Plant No. 1
Results
TX

West District Treatment Plant Wet Well Cleaning
Post-Bid
Baytown, TX 77520

3" Trash Pump
Results
Less than $2,544 est. value
Houston, TX 77252

Y1PZ--Install New Irrigation Well at Houston National Cemetery
Post-Bid
Houston, TX 77038

2" Trash Pump
Results
Less than $1,737 est. value
Houston, TX 77252

Various Types, Sizes of Pumps and Accessories
Post-Bid
Houston, TX 77251

Construction of Remote Water Well and Water Plant No. 2 Expansion
Results
$2,991,000 est. value
Humble, TX 77396

Well 1 Chloramine Conversion
Post-Bid
$150,000 to $200,000 est. value
Morgans Point, TX 77571

Lift Station No. 3 and 4 Rehabilitation and Pump Replacement
Results
Spring, TX 77379

Last Updated 10/20/2021 10:02 AM
Project Title

Water Well Replacement at Fritsche Park, Precinct 4

Physical Address View project details and contacts
City, State (County) TX   (Harris County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the construction of one (1) six (6) inch diameter steel cased well with four (4) inch stainless steel pipe-based screen, equipped with a 7.5-horsepower submersible well pump and motor, discharge surface piping, liquid chlorination peristaltic pump and bulk storage container within an enclosure and backup pump, reinforced concrete equipment seal slab with compacted subgrade and sloped around well head, 2,535 gallon ASME code hydropneumatic tank equipped with top mounted air compressor and subject fittings and gauges noted on plans, coating of above ground ductile iron yard piping, underground yard piping to extend 5-feet past the equipment slab edge.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents