Similar Projects
Purchase and Installation of Source Capture Removal Systems
Bidding
Irondale, AL

Highlands HVAC Replacement
Bidding
$450,000 est. value
Birmingham, AL 35233

On-Call HVAC Services
Post-Bid
Birmingham, AL 35255

Volker Hall, 5th Floor, Air Handler Replacement
Post-Bid
$210,000 to $245,000 est. value
Birmingham, AL 35233

Biomedical Research Building II, First Floor HVAC Improvement
Results
$65,000 to $85,000 est. value
Birmingham, AL 35233

Edgewood Elementary School and Shades Cahaba Elementary School HVAC Replacements
Results
Birmingham, AL 35209

Birmingham City Schools HVAC Upgrades
Bidding
Birmingham, AL

HVAC Condenser Unit Relocation at the HABD Elyton Village Housing Community
Post-Bid
Birmingham, AL 35233

Cooling Tower Refurbishment
Results
$1,000,000 to $1,100,000 est. value
Birmingham, AL 35233

Cleaning of Hoods and Vents
Post-Bid
Birmingham, AL 35294

Mountain Brook High School Social Science Building RTU Replacements
Results
Less than $320,000 est. value
Mountain Brook, AL

Henry Peters, 4th Floor, Air Handler Replacement
Post-Bid
$215,000 to $255,000 est. value
Birmingham, AL 35233

Miles College Kirkendoll LRC HVAC Upgrade
Results
Fairfield, AL 35064

Breathing Air Compressor
Post-Bid
Irondale, AL 35210

HVAC Upgrades for Media Center and Nurses Station, Westhills Elementary School
Results
Less than $100,000 est. value
Bessemer, AL 35022

Reported 02/18/2020 12:00 AM
Project Title

Jefferson County Alabama Mechanical Equipment Asset Program Fy20

Physical Address View project details and contacts
City, State (County) AL   (Jefferson County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project will be constructed at two separate JeffCo facilities, the Bessemer Courthouse Annex, and the JeffCo Birmingham Public Safety Center. Work at the Bessemer Courthouse Annex, located at 1801, 3rd Ave North, Bessemer, AL shall include the complete replacement of two roof mounted, 250 ton cooling towers. The existing structural steel shall be modified and re-used; the condenser water supply and return piping shall be replaced within ten feet of the tower and will include manual automatic isolation valve. The new cooling tower controls shall be integrated with the existing facility direct digital control system, and all associated sensors and controllers shall be replaced. Work at the JeffCo Birmingham Public Safety Center, located at 2120 Reverend Abraham Woods Jr. Boulevard in Birmingham, AL shall include the complete replacement of two indoor 125 boiler horsepower heating hot water boilers. The hot water supply and return piping shall be modified to accommodate the new boiler installation and all automatic valves, and manual isolation valves shall be replaced. The new boiler controls shall be integrated with the existing facility direct digital control system and all associated sensors and controllers shall be replaced.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents