Similar Projects
Z--Mechanical, Electrical and Plumbing (MEP) Multiple Award Construction Contract
Design
$150,000 to $10,000,000 est. value

Boiler Installation and Repair
Term Contract
Bidding
Raleigh, NC 27610

Renovation of Mechanical System at the Mooresville Police Department
Post-Bid
Morrisville, NC

Water Heater
Post-Bid
Raleigh, NC 27603

Aerco Condensing Boilers
Results
Less than $78,200 est. value
NC

AERCO Condensing Boiler
Results
Less than $40,656 est. value
Raleigh, NC

Mechanical Equipment Replacements
Results
Raleigh, NC 27603

South Wilmington Street Center - Mechanical System Replacement
Results
Raleigh, NC

New Revenue Building Mechanical Equipment Replacement
Results
Raleigh, NC

Water Conditioning
Term Contract
Results
Raleigh, NC

Motor Replacements for Cooling Towers
Results
Raleigh, NC

Condensate Tank
Results
Less than $23,773 est. value
Raleigh, NC

Northern Wake Campus Exterior Hydronic Piping and Equipment Addition
Results
Raleigh, NC

Water Treatment Program - Boiler Systems
Term Contract
Results
Raleigh, NC 27603

Water Treatment Program - Closed Hot Water Loops
Term Contract
Results
Raleigh, NC

Reported 03/08/2019 12:00 AM
Project Title

Steam Repairs Phase VIIIC

Physical Address View project details and contacts
City, State (County) Raleigh, NC   (Wake County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description This project will complete upgrades to the steam and condensate piping in the North Campus walkable steam tunnel, trench and mechanical rooms of DH Hill Library. The scope includes asbestos abatement; removal of steam pipe and condensate pipe, the Pressure Reducing Valve (PRV) station, and existing pipe hangers; excavation over the trench located south of the Atrium; installation of new 150 psi steam and condensate pipe, structural supports, and taps on the tunnel piping; installation of insulation around the new 150 psi steam pipe; installation of new PRV stations in the mechanical rooms.
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 33 - Utilities, Schedules for Utilities, Schedules for Hydronic and Steam Energy Utilities.
Division 40 - Process Integration, Steam Process Piping, Intermediate-Pressure Steam Process Piping.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents