Similar Projects
HVAC at Conference Center
Post-Bid
Forsyth, GA 31029

Fire Stations 5 and 10 HVAC Replacement
Post-Bid
Fayetteville, GA 30215

45--Provide Boiler Burner W/Installation. Remove Existing Defective Burner From #3 Boiler Supply And Install New Webster Natural Gas And #2 Fuel Oil Fired Burner, Model Hds5c-150B.
Results
Augusta, GA 30904

Replacement of Central HVAC System
Results
Lakeland, GA 31635

Clarkston Campus CD Building Install Screw Chiller and Replace AHU Cooling Coil
Post-Bid
Less than $910,000 est. value
Atlanta, GA 30302

Jefferson Parkway Elementary School HVAC Renovations
Results
Less than $2,900,000 est. value
Newnan, GA

HVAC Maintenance Services (Middle and High Schools)
Post-Bid
Athens, GA 30603

HVAC Renovations Newnan Crossing Elementary School
Renovation
Results
Less than $4,300,000 est. value
Newnan, GA

McKendree Elementary School - HVAC and Roof Modifications
Post-Bid
Suwanee, GA 30024

HVAC Renovations to Thomas Crossroads Elementary
Results
Less than $2,500,000 est. value
Sharpsburg, GA 30277

Brookwood High School - HVAC Modifications
Post-Bid
Snellville, GA 30078

HVAC Renovations to Arnall Middle School
Results
Less than $4,500,000 est. value
Newnan, GA 30265

City Hall HVAC Purification System
Post-Bid
Alpharetta, GA 30009

Replace HVACs - St Simons Island, GA
Results
Saint Simons Island, GA 31522

Harris County High School HVAC Renovation
Post-Bid
Less than $3,000,000 est. value
Hamilton, GA 31811

Reported 02/19/2022 12:00 AM
Project Title

Campus-Wide HVAC Upgrades Floyd and Heritage

Physical Address View project details and contacts
City, State (County) Rome, GA 30161   (Floyd County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value $4,589,250
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This project will integrate multiple IAQ improvement strategies into one integrated approach using design-build project delivery. The first step and foundation of these strategies will be a study of HVAC systems in buildings on the Floyd and Heritage Hall campuses. The study will result in recommended HVAC systems modifications to improve IAQ and mitigate/reduce the potential for transmission of viruses and pathogens like coronavirus. Expected outcomes of the study are recommendations for air handler repairs/modifications/replacements, replacement/renewal to building automation controls and programs, duct cleaning and/or replacement, and the installation of airborne microbial and particulate elimination technologies such as better filtration, ultraviolet lighting, bi-polar ionization, etc. Cost assumptions to date are conceptual. The cost of work to be installed will be refined in the design-build program to be developed by the project team, heavily relying on the design and costing services

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents