Similar Projects
UC Davis Health Campus Folsom
New Construction
Conception
Folsom, CA 95630

Tuscan Neighborhood Park - WCE901 - City of Elk Grove
Infrastructure
Conception
$5,383,000 CJ est. value
Elk Grove, CA 95624

Phan Apartment Homes At Sierra Vista Park
New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Sacramento, CA 95823

Valley Rail Project / Altamont Corridor Express- San Joaquin Joint Power Authority
Infrastructure
Design
$404,000,000 CJ est. value
Sacramento, CA 95814

Broadway Complete Street Project
Infrastructure
Bidding
$11,000,000 CJ est. value
Sacramento, CA 95814

Northwood School Access Improvements Project
Infrastructure
Bidding
$500,000 CJ est. value
Sacramento, CA 95815

Trade Subcontractors for Faculty and Staff Housing Project
New Construction, Renovation - 30,000 SF
Post-Bid
$14,000,000 est. value
Sacramento, CA

RFQ Engineering - Design Services for Merced to Madera
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Sacramento, CA 95814

On-Call Drilling and Well Installation Services for City Landfills
Term Contract, Alteration
Results
Sacramento, CA

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

3S Apartments
Demolition, New Construction, Infrastructure - 2,300 SF
Construction
$71,500,000 CJ est. value
Sacramento, CA 95811

Shops at Folsom Ranch
New Construction, Infrastructure - 27,900 SF
Construction
$9,000,000 CJ est. value
Folsom, CA 95630

Sunrise Mall Redevelopment
New Construction, Infrastructure - 695,000 SF
Pending Verification
$400,000,000 CJ est. value
Citrus Heights, CA 95610

Ice Box
New Construction, Infrastructure - 79,190 SF
Pending Verification
$25,000,000 CJ est. value
Sacramento, CA 95811

Folsom Plan Area Fire Station #34 - City of Folsom
New Construction, Infrastructure
Conception
$10,800,000 CJ est. value
Folsom, CA 95630

Last Updated 04/25/2023 12:08 AM
Project Title

American River College Natomas Center Ph II & III

Physical Address View project details and contacts
City, State (County) Sacramento, CA 95835   (Sacramento County)
Category(s) Education, Heavy and Highway
Sub-Category(s) College/University, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $48,247,400 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

19279.10 The estimated construction cost of this project is $46,221,099.00. Response Format Electronic Project Type Bid Response Types Line Items Bid Affirmation (required) Bid Bond (required) Contractor Qualification (required) Designation of SubContractors (required) Non-Collusion Declaration (required) Statement of Compliance (required) Type of Award Lump Sum License Requirements B Bid Valid 90 days Liquidated Damages $500.00/day 1-30 days; $1,500.00/day 30 + days Start/Delivery Date Anticipated Anticipated 04/24/23 Project Duration 550 days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Online Q&A Yes Q&A Deadline 03/06/2023 12:00 PM (PST) DSA # 02-118581 Restricted To Must meet one of the following restrictions: CADIR - Registered DIR Public Works Contractor Pre-Bid Meeting: NO parking pass required, but all attendees must park in "Student Parking" areas only. The work shall consist of, but not limited to 1. construction of minor improvements to the Phase 1 Bldg. and the Natomas Center - Phase 2 & 3 New Instructional Building, approximately 52,240 sq.ft. building, including: Phase 1 Bldg. - Small facade improvement facing the new courtyard for the new instructional facility. Refer to construction document for the location and extend of facade improvement. Phase 2 & 3 Bldg. - New two-story instructional facility housing classrooms, computer & science labs, office spaces and student collaboration areas. This new facility will be located on an open parcel adjacent to the existing Phase 1 Bldg. Both buildings will serve as a satellite campus to American River College. This new facility will interact and engage the courtyard and surround site and landscape. Adjacent Site - The site improvements include a central courtyard to aide in student collaboration and rest. Our site improvements outside the building footprint upgrade our site amenity to include electric vehicle parking and preparation for future EV stalls. All adjacent paved areas affected by our project will be patched, repaired in like kind.

Details

52,240 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents