Similar Projects
Madison Food Park Cheese Processing Facility
New Construction, Infrastructure
Conception
$9,000,000 CJ est. value
Great Falls, MT 59401

3rd Avenue North 9th to 11th Street Reconstruction - City of Great Falls
Infrastructure
Conception
$500,000 CJ est. value
Great Falls, MT 59404

D/ B - Emergency Relief (ER) - Red Lodge Area Flood Repairs
Infrastructure
Design
$300,000 est. value
Red Lodge, MT 59068

Richey Shop Building
New Construction, Infrastructure
Bidding
$300,000 CJ est. value
Richey, MT 59259

Love's Travel Stop # 679 - RV Park / Hardin
New Construction, Infrastructure - 658 SF
Bidding
$200,000 CJ est. value
Hardin, MT 59034

HRDC Community First Griffin Place Site and Infrastructure
Demolition, Infrastructure
Post-Bid

HRDC Community First Griffin Place Site and Infrastructure
Demolition, Infrastructure
Post-Bid

Chip Seal Fog Seal Tri-Hill Frontage Road Great Falls Area
Infrastructure
Results
Great Falls, MT 59404

Scrub Seal Hwy 10 E Se of Greycliff Interchange Billings Area
Infrastructure
Results

Rivers Edge Trail Connector Project - Montana Department of Transportation
New Construction, Infrastructure
Pending Verification
$2,800,000 CJ est. value
Great Falls, MT 59405

Rivers Edge Trail Connector Project - Montana Department of Transportation
New Construction, Infrastructure
Pending Verification
$2,800,000 CJ est. value
Great Falls, MT 59405

52nd Street North 7th to 10th Avenue North Reconstruction - City of Great Falls
Infrastructure
Conception
$600,000 CJ est. value
Great Falls, MT 59405

Forest Park Transmission Mains
Infrastructure
Bidding
$2,000,000 CJ est. value
Glendive, MT 59330

Cold Milling, Cold Central Plant Recycle or Pulverization, PMS Overlay, Bridge Deck Repairs, Seal
Infrastructure
Post-Bid
MT

MT Dar 2022(1), Defense Access Roads FY 2022
Term Contract
Results
$5,000,000 to $7,000,000 est. value
Great Falls, MT

Last Updated 04/20/2023 06:03 AM
Project Title

Cottonwood Road Rebuild

Physical Address View project details and contacts
City, State (County) Deer Lodge, MT 59722   (Powell County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $253,777 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

All Bid envelopes must be sealed and marked with "CITY OF DEER LODGE COTTONWOOD ROAD REBUILD" or the Bid will not be accepted. Description of the Work: The project consists of 1,900 CY excavation and haul off, 2,086 SY of 4-inches asphalt, 3 slotted manholes, 380 CY 6-inch cobbles (French drain), 130 LF modified curb and gutter, 288 LF double gutter, and 587 SF of 6-inch concrete. An electronic version is also available. CONTRACTOR and any of the CONTRACTOR'S subcontractors doing work on this project will be required to obtain registration with the Montana Department of Labor and Industry (DLI). Forms for registration are available from the Department of Labor and Industry, P.O. Box 8011, 1805 Prospect, Helena, Montana 59604-8011. Information on registration can be obtained by calling (406) 444-7734. CONTRACTORS are not required to have registered with the DLI prior to bidding on this project but must have registered prior to execution of the Construction Agreement. All laborers and mechanics employed by CONTRACTOR or any subcontractors in performance of the construction work shall be paid as described in the WAGE RATE SECTION and as required by the state of Montana. The CONTRACTOR must ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex or national origin. . QUESTIONS may be submitted in writing to Kurt Thomson, kthomson@ seaeng.com, prior to February 27th, 2023. Questions received after February 27th, 2023 may not receive a response. Acknowledgement of Bidders satisfaction as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work is a condition of bidding on the work. Insurance as required shall be provided by the successful BIDDER(s) and a certificate(s) of that insurance shall be provided. The contract provides for sixty (60) calendar days for completion of the work. The contractor will be assessed liquidated damages in the amount of $1500 per calendar day for time required beyond that provided. No bid may be withdrawn within a period of sixty (60) days after the scheduled time for the public opening of bids, Owner reserves the right to cancel or terminate this Bid, reject any one or all proposals received in response to this Bid, to waive informalities, and not award or if awarded, terminate any contract on the grounds of a determination by Owner that adequate budgeted funds to expend on a resulting contract were not available to Owner. The Owner reserves the right to postpone the award of the contract for a period of not to exceed sixty (60) days, and to accept the lowest responsive and responsible bid which is in the best interest of the OWNER.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents